Skip to main content

BKV Group: Fire Stations Planning Feasibility Brochure

Page 1


Fire Station Planning & Feasibility

Fire Station

PLANNING & FEASIBILITY

Whether your concerns are physical, functional, or both, BKV Group can help you document issues with your existing fire station(s), estimate their financial impact, and recommend next steps. Assessments include a review of structural degradation, NFPA compliance, energy expenses, operational inefficiencies, firefighter cancer concerns, electrical and communications infrastructure, deferred maintenance items, end-of-lifecycle replacements, code compliance, and many other topics.

SITE FEASIBILITY MASTERPLAN

BKV Group conducts thorough constraints analyses to assess site feasibility, considering factors like response times, zoning regulations, building massing, circulation for apparatus, utility placement, wayfinding, topography, community connectivity metrics and more. We integrate this data into a building information model to explore site utilization options, prioritizing considerations such as aesthetics, functionality, and financial viability.

SPACE NEEDS ANALYSIS

BKV Group assesses your space requirements through staff discussions, department surveys, post-occupancy evaluations, demographic forecasts, and industry best practices. We lead discussions on right-sizing, documenting the program with spreadsheets and room criteria sheets. These detail adjacencies, finishes, equipment, furniture, and design constraints, creating a precise costing model before design begins.

COMMUNITY SUPPORT

BKV Group assists in advocating for new or replacement fire stations and garnering community support through various channels like neighborhood meetings, community charrettes, press releases, project websites, and direct mailings. We utilize line drawings, renderings, Virtual Reality goggles, spreadsheets, and charts to clearly illustrate the local, regional, and global benefits, facilitating approvals, zoning changes, or public funding.

HENRICO COUNTY FIREHOUSE

FIREHOUSE 19 | Short Pump, Virginia

CONCEPTUAL PLAN

Goshen, Indiana

BKV Group finished up Fire Station #2 in Rochester, MN. It was a very challenging project with site issues and property acquisition issues. We had a tight budget and they were able to bring it in on time and on budget. [BKV Group] was just fantastic on how they collaborated with the department and my fire group. I was so impressed with the project that when I retired from the Rochester Fire Department, I went to go work for BKV Group.

Greg “G.K” Martin

Previous BKV Fire Service Operations Expert

Retired Fire Chief of Rochester

Through all of the projects, I must say that BKV Group stands out by having demonstrated their professional approach and showing flexibility to adjust the project schedule and program changes in support of our goals.

Ed Bass

Henrico County Senior Project Manager

Fairfax County continues to improve services to our residents and businesses through new facilities like this, bringing state-of-the-art emergency readiness and enhanced emergency medical rescue services. I am also thankful to BKV Group for its dedication to designing our new building with energy-efficient systems to meet LEED Gold certification.

Dan Storck

Mount Vernon District Supervisor Fairfax County

What it really made this project a success was the team. Going back to the initial meeting Chief Slama and I had with Kraus Anderson in August of 2021, to official hiring the 3 key partners of KA, BKV, and Tegra all the way up to the [Grand Opening] event. This group has always worked tirelessly to deliver the community a state-of-the-art Fire Station that it needed and deserved. Its wasn’t always easy (projects like this never are)…but this team always had the end goal in sight and by the turnout tonight it was a hit.

Derik Otten City of Edina Facility Manager LEED AP, CFM

Check out our client-focused film, “Their Space, Their Story,” which focuses on how BKV Group serves those who serve us.

Turn static files into dynamic content formats.

Create a flipbook
BKV Group: Fire Stations Planning Feasibility Brochure by BKV Group - Issuu