Skip to main content

BKV Group: Funding a New Jail (RJI)

Page 1

Rural Jail Initiative

Funding a New Jail A practical, step-by-step roadmap for rural counties to move from need to delivery

A RC H I T EC T U R E | I N T E R I O R D E S I G N | U R BA N D E S I G N & L A N D S C A P E A RC H I T EC T U R E E N G I N E E R I N G | CO N S T R U C T I O N A D M I N I S T R AT I O N | B R A N D E D E N V I RO N M E N T S | S U S TA I N A B L E D E S I G N


A CLEAR PATH TO FUNDING A NEW JAIL A Practical Roadmap for Rural Counties For many counties, the need for a new or updated jail is clear. The challenge is not identifying the problem. The challenge is moving forward with confidence. Uncertainty around cost, public support, and the process itself often delays projects for years. During that time, conditions do not remain static. Costs continue to increase, and operational pressures continue to grow. A successful project requires more than a building solution. It requires a clear, structured path to funding and delivery.

A More Coordinated Appro

A more coordinated approach aligns fac communication into a single process.

1. Due Diligence

Before advancing a funding strategy, co feasibility. This includes:

• Community surveys to gauge support

• Analysis of prior referendums and voti

• Identification of required approval thr

• Stakeholder interviews to understand

Why Projects Stall

Outcome: A clear understanding of wha

Counties consistently face the same barriers:

2. Strategic Planning

• Unclear or evolving project costs • Difficulty communicating need to the public

The next step establishes a coordinated This includes:

• Limited internal capacity to manage a campaign

• Committee structure and leadership r

• Uncertainty about voter support and referendum outcomes

• Campaign budgeting and resource pla

• Lack of alignment between facility planning and funding strategy

• Timeline aligned with election cycles

Without addressing these issues early, even necessary projects struggle to gain traction.

Outcome: A realistic plan that aligns lea

3. Communication Framework

Clear, consistent messaging is critical to includes:

• Defining the core narrative around sa

• Translating facility needs into underst

• Addressing common concerns such as

Outcome: A message the public can und

4. Supporting Materials

Providing clear, consistent tools for com • Fact sheets and summaries

• Presentation materials for boards and

• Visual diagrams explaining operations

• Digital content to support outreach a

Outcome: Materials that support inform

5. Leadership Preparation

Public engagement requires confident, c

• Preparation for presentations and com

• Talking points aligned with messaging

• Ongoing guidance throughout the pro

Outcome: A unified, credible voice thro


oach

Why This Must Align With Delivery

cility planning, funding strategy, and public

Funding strategy alone is not enough. Counties often attempt to advance a referendum or financing plan before the project is fully defined, leading to: • Cost uncertainty

ounties need a clear understanding of

• Changing scope • Loss of public trust

t and concerns

ting patterns

resholds and turnout scenarios

d local dynamics

at it will take to move forward.

For this approach to be effective, it must be aligned with a clearly defined project and delivery strategy.

The Role of the RJI Approach The RJI approach aligns planning, funding, design, construction, and transition into a single, accountable process. This includes:

d path aligned with timing and resources.

• A clearly defined facility program aligned with operational needs

roles

• Integrated funding strategy support, including referendum planning and evaluation of alternative delivery models such as public-private partnerships

anning and project milestones

• A reliable project cost framework to support funding decisions and public approval

adership, resources, and timing.

• Single source responsibility for delivery • Staff training, policy development, and transition support

o public understanding and support. This

By integrating funding strategy with a defined project and cost, counties can communicate with clarity:

afety, operations, and community impact

• What will be built

tandable terms

• What it will cost

s cost, staffing, and long term value

• How it will operate

derstand and trust.

mmunication and decision making includes:

d public meetings

s and benefits

and transparency

med and consistent communication.

consistent delivery. This includes

mmunity discussions

g strategy

ocess

The Result Counties that take this integrated approach gain: • Greater confidence in funding decisions • Clear alignment between need, cost, and communication • Reduced risk of failed referendums or delayed projects • A smoother path from concept through occupancy

MOVING FORWARD Every county is different. The most effective starting point is understanding what a clear and realistic path forward looks like for your specific conditions. In some cases, alternative delivery and financing models such as public-private partnerships (P3) may also support project feasibility. These approaches can be evaluated alongside traditional funding methods as part of an overall strategy.

oughout the process. Scan to learn more:


Se e mo re of our wo r k

B KV G ROUP RURAL JA IL INITIATIV E - LE A DE RSHIP TE A M

KYLE YARDLEY

PAUL MICHELL

DANIEL GILLEN

Justice Practice Leader, Partner Chicago, IL

Government Practice Leader, Partner Minneapolis, MN

Manager of Design, Associate Partner Chicago, IL

MICHAEL MALONEY

BRIAN DOVE

BRIAN REISING

Project Manager Chicago, IL

Project Manager Chicago, IL

Project Manager Chicago, IL

B K V G RO UP RURAL JAI L I NI TIATIV E - REGIONA L LE A DE RSHIP CONTACTS KYLE YARDLEY Justice Practice Leader, Partner

PHIL CALLISON Government Practice Leader, Partner

PAUL MICHELL Government Practice Leader, Partner

MARK MANETTI Government Practice Leader, Partner

C H I C AG O

DALLAS

MINNE APOL IS

WASH I N GTO N , DC

209 South LaSalle Street The Rookery, Suite 920 Chicago, IL 60604

1412 Main Street Adolphus Tower, Suite 700 Dallas, TX 75202

222 North Second Street Long & Kees Building, Suite 101 Minneapolis, MN 55401

1054 31st Street NW Canal Square, Suite 410 Washington, DC 20007

P 312.279.0470

P 469.405.1196

P 612.339.3752

P 202.595.3173

W W W . B K V G R O U P. C O M


Turn static files into dynamic content formats.

Create a flipbook
BKV Group: Funding a New Jail (RJI) by BKV Group - Issuu