Skip to main content

HYS Improving Connections

Page 1

Additional poletop lights where required)

Existing seating & substation

STREET

1. Traffic calming including widened footpaths with kerb ramps 2. Raised pedestrian crossing on Station Street 3. Planted blisters & islands to improve visibility and slow down traffic in vicinity of crossing

EXISTING PLAYGROUND

4. Extend handrail to full length of the laneway, allow 2m gaps wherever needed, with integrated lighting 6. Wayfinding signage for better local navigation & interpretation

LANEWAY (BELMORE WALK) 8

7. Additional seating integrated with existing raised planter

2 4

8

Existing lighting to be retained

8. Renew pavement & Opportunity for artworks to be integrated into paving & landscape

Allow turning for 12.5m-long trucks to both directions Project extent Lighting opportunity Traffic flow

Belmore Walk and Precinct Concept Plan

6

Opportunity to relocate 3 light poles as part of path medians to improve pedestrian safety (loss of some parking)

7

5

3

1 BELMORE STREET

3

1 STATION

5. Modify existing retaining wall to widen footpath

3

1


Turn static files into dynamic content formats.

Create a flipbook
HYS Improving Connections by baysidecouncilnsw - Issuu