Skip to main content

PART 2_Architecture Internship Report_2022

Page 1

PRACTICUM REPORT

DEPARTMENT OF ARCHITECTURE

6. LAZIMPAT MIXED-USE HOTEL:

Supervising Architect: Ar. Nayan Raj Bajrcharya i. INTRODUCTION: • Location: Lazimpat, Kathmandu. • Composition: Mixed use(Hotel and Corporate offices). • Structure: Concrete frame structure • Architecture style: Contemporary • Area: 26,285.5 sq. ft. • Total built up area: 148,423 sq. ft. • Project phase: Design Development ii. PROJECT BRIEF: The site was with 24.5m frontage and elongated approx,90m inside with z-twist. The Building footprint was defined by the setback and stands out with curvilinear form. The interesting design guide factor was the Circulation of vehicles. Entry then gradually reaches up to the middle node for drop off, and turning around the front building either exits out or to the basement. Directly above the drop off node the sky bridge connects the two towers where the lounge is celebrated.

36

PRAKASH TAMANG

PUR075BAR029

4TH YEAR 1ST PART


Turn static files into dynamic content formats.

Create a flipbook
PART 2_Architecture Internship Report_2022 by Prakash Tamang - Issuu