Skip to main content

Leeds City Council Heat Pump Decarbonisation Programme

Page 1

Heat Pump Decarbonisation Programme Leeds City Council

Contract Overview

Specifications

Axis is delivering air source and water source heat pump installations across eleven Leeds City Council sites as part of the authority’s carbonreduction strategy. Works include the replacement of outdated systems and installation of associated infrastructure, funded through phases 3b and 3c of the Salix Public Sector Decarbonisation Scheme.

• Installation and handover of ASHP and WSHP across 11 sites • Associated works including BMS systems, plant room works, substations, insulation and solar PV • Funded by Salix PSDS Phase 3b and Phase 3c • Procured via the PfH Decarbonisation & Retrofit framework

The programme is an example of Axis’ capability to deliver funded decarbonisation works at scale, following our appointment via the PfH Decarbonisation & Retrofit framework. Axis assumed delivery after a previous contractor went into administration, and has built a strong and collaborative relationship with the client through this programme. Benefits • Supports Leeds City Council’s carbon-reduction goals across multiple sites • Helps reduce heating and electrical costs for the local authority and its services

£8.5m+ value 2025-2027 duration

• Improves heating performance within buildings • Enables Leeds City Council to remotely monitor energy consumption and the savings achieved through the programme • Provides sustainable, modern heating systems that replace outdated equipment • Reduces operational costs for council services, including museums and schools Housing | Commercial | Heritage | Public Sector | Education

Contact julian.campbell@axiseurope.com axiseurope.com


Turn static files into dynamic content formats.

Create a flipbook
Leeds City Council Heat Pump Decarbonisation Programme by Axis CLC - Issuu