Multi-site Decarbonisation Programme Leeds City Council, 17 sites

Highlights

Specifications

Leeds City Council employed Axis as Principal Contractor for the installation of Salix grant-funded Public Sector Decarbonisation Scheme (PSDS 3b and 3c) Air Source Heat Pumps (ASHPs) and Water Source Heat Pumps (WSHPs) at 17 sites in Leeds.

• 17 sites include leisure centres, heritage sites, schools, a council vehicle servicing depot and a care centre for adults with disabilities • Air Source Heat Pumps (ASHPs) • Water Source Heat Pumps (WSHPs) • Building Management Systems (BMS) and zonal controls • Low Temperature Hot Water (LTHW) heating systems • Distribution Network Operator (DNO) upgrades • Roof and ground-mounted solar PV • Associated works including plant room, sub stations and insulation • Funded by Salix PSDS Phase 3b and Phase 3c • Procured via Procurement for Housing’s (PfH) Decarbonisation and Retrofit framework 2023 -2027

Salix funding schemes enable the public sector to reduce carbon emissions in line with the UK Government’s commitment to becoming Net Zero by 2050. Projects funded through PSDS schemes, deliver carbon reductions of 40%+ across the estate while reducing operational costs and tackling fuel poverty. Axis won this contract via Procurement for Housing’s (PfH) Decarbonisation and Retrofit framework 2023-2027, after an evidenced-based selection process, including client referrals and interview. Additional installed solutions in the programme include Building Management System (BMS) upgrades and zonal controls, new sub stations and Distribution Network Operator (DNO) upgrades, and roof and ground-mounted solar PV. The sites include leisure centres, heritage sites, a council vehicle servicing depot, schools and a care centre for adults with disabilities.

Housing | Commercial | Heritage | Public Sector | Education

£9m value 3 years duration