Case Study | Social Housing | Planned Maintenance
DURATION
8 Months CONTRACT VALUE
£1.1m 98
NUMBER OF FIRE DOORS
View the Case Study & Video
Stonewater REFURBISHMENT & FIRE SAFETY WORKS TO RETIREMENT LIVING SCHEME
Project Details Stonewater appointed CLC to refurbish a retirement living scheme in Dudley, transforming the internal and external communal areas of the three-storey, 34-flat development. The project has given the scheme a fresh identity, with modern, high-end spaces that are almost unrecognisable from before. Works included new flooring, lighting, ceiling replacements, external redecoration, and roof upgrades, creating a premium finish inside and out. Flat entrance doors were replaced to complement the refresh, while new fire alarm, warden call, and TV aerial systems were installed. Safety measures were also addressed with asbestos removal and 98 new fire doors. A notable enhancement was the replacement of the front leadwork, approved by the listed buildings officer, further elevating the building’s appearance.