Skip to main content

CLC Case Study - Premier Inn / Wirral Met College - Refurbishment

Page 1

Case Study | Hotel & Leisure | Refurbishment

DURATION

6 Weeks VOLUNTEERED HOURS

1,920

150 sq m AREA TRANSFORMED

View the Case Study & Video

Premier Inn & Wirral Met College HOSPITALITY TRAINING CENTRE

Project Details We partnered with Wirral Met College and Premier Inn to create a fully functioning hotel training facility, mirroring the real Premier Inn experience. Over six weeks, our team transformed an outdated space into an industry-grade environment for students aged 16–24. Valued at over £50,000, the project was delivered free of charge through a donation of management, labour, and materials, reflecting our commitment to the community and our long-standing relationship with Whitbread. Part of Whitbread’s national Thrive programme, the facility includes three en-suite bedrooms, a reception, corridor, and linen room – all built to operational hotel standards. It provides up to 36 students with special educational needs and disabilities (SEND) each year a safe, realistic setting to build hospitality skills and confidence for future employment.


Turn static files into dynamic content formats.

Create a flipbook
CLC Case Study - Premier Inn / Wirral Met College - Refurbishment by Axis CLC - Issuu