Project Details

CLC has delivered a major decarbonisation and refurbishment programme at Bradford Royal Infirmary and St Luke’s

supporting Bradford Teaching Hospitals NHS Foundation Trust’s sustainability objectives and

The

as well as the installation of

“ “

Overall it’s been a really positive relationship with CLC. Our Capital team work closely with them to manage the project programme to make sure that we’re delivering on key milestones on time to manage costings. I know that I could get in touch with our project manager at CLC; he’s very responsive and has really helped with engagement throughout this project.

Head of Sustainability

Highlights

CLC has installed approximately 1,700 solar panels across both hospitals, replaced 48 windows with energy efficient windows, and upgraded two roof structures with modern insulation systems.

Working within live hospital environments, our teams have carefully planned and sequenced works to minimise disruption to patients, visitors and staff. Close collaboration with the Trust’s Estates and Capital teams has ensured safe, efficient delivery while maintaining full operational continuity.

The aim of this project was to reduce energy consumption, carbon emissions and operating costs, while supporting NHS Net Zero Carbon targets and helping protect the Trust against rising energy prices – which CLC have delivered successfully for the Trust.

CLC delivers comprehensive retrofit and decarbonisation programmes through its dedicated Decarbonisation and Quality Assurance (DQA) Team, providing technical oversight, compliance management and quality assurance throughout the project lifecycle.

Specifications

Solar Photovoltaic (PV) installations

Roof insulation upgrades

Energy-efficient window replacements

Scaffolding and enabling works

Live healthcare environment

BRADFORD TEACHING HOSPITALS NHS FOUNDATION TRUST

Patient Care & Communication

CLC has extensive experience delivering refurbishment and decarbonisation projects within live healthcare environments where patient care remains the highest priority. Working closely with Trust Estates teams and clinical staff, works were carefully planned and phased to minimise disruption to hospital services. Controlled access arrangements, clear communication and strict infection prevention and control measures were maintained throughout.

Our DBS-checked operatives are trained in patient care awareness and understand the requirements of working in occupied clinical settings. Through detailed planning and close stakeholder liaison, we deliver complex projects safely while maintaining patient wellbeing, operational continuity and high standards of quality.

Client Relationship

CLC has built a strong collaborative relationship with Bradford Teaching Hospitals NHS Foundation Trust throughout the programme. Working closely with the Trust’s Estates and Capital teams, we have delivered key milestones while maintaining programme certainty, cost control and operational continuity.

The project’s success has been driven by transparent communication, proactive problemsolving and a shared commitment to sustainability. This collaborative approach has also identified future opportunities for retrofit and decarbonisation investment across the Trust’s estate.

Client Benefits

Energy Savings

Reduces overall energy consumption and carbon emissions.

Cost Reduction

Lowers operational energy costs.

On-Site Renewables

Increases renewable energy generation at the hospital.

Future Resilience

Protects against energy price volatility.

Thermal Efficiency

Improves the thermal performance of buildings.

Net Zero Support

Helps achieve NHS Net Zero Carbon objectives

Better Environments

Enhances comfort for patients and staff.