Skip to main content

Axis Rosehill Court case study

Page 1

Full Refurbishment Programme Sutton Housing Partnership Rosehill Court, Saint Helier, Sutton

Highlights

Specifications

Axis delivered a comprehensive refurbishment programme for a 1930s estate comprising 59 flats and 10 ground-floor commercial units. The project, scheduled from September 2024 to March 2026 (a 19-month duration), was vital as the estate had been on hold since 2023. This delay left residents dealing with persistent leaks, damp, and mould.

• Roofing strip • Langley system • uPVC windows • Masonry repairs • Mechanical ventilation • FRA risers • Void refurbishment • External decorations

We stripped the redundant old roof and installed a new Langley Waterproofing system with a 25-year guarantee. To improve thermal efficiency and the building’s envelope, we installed new uPVC double-glazed windows and doors across all residential and commercial units, alongside extensive masonry and brickwork repairs. Internally, we addressed moisture issues by installing new mechanical ventilation systems and performed EICR (Electrical Installation Condition Report ) remedial works. Safety was a priority, involving the installation of FRA-certified riser heads and lightning conductor systems. Additionally, we replaced kitchens and bathrooms in 18 void properties received full kitchen and bathroom replacements to provide modern living standards for new tenants. Housing | Commercial | Heritage | Public Sector | Education

£3.1m value 19 months duration


Turn static files into dynamic content formats.

Create a flipbook
Axis Rosehill Court case study by Axis CLC - Issuu