Chelsea Fire Station Window Renewal Project The London Fire Brigade
Highlights
Specifications
Axis was appointed by The London Fire Brigade (LFB) to undertake a window renewal project at their iconic Kings Road Fire Station in Chelsea.
• Asbestos inspection and removal • Full scaffolding with goods hoist • Asbestos specialist window removal to 3 floors • Ceiling renewals • New window installations • M&E works to include ventilation and air conditioning • Exterior facade works
The project involved erecting full scaffolding to the Fire Station complete with goods hoist for the windows and materials, bridging the scaffolding over the emergency automated Fire Engine doors to ensure the Fire Fighters could attend emergency calls without works obstructing their quick exit. Work commenced with the removal of the old windows utilising an approved Asbestos Specialist to undertake an inspection for any suspected asbestos contamination within and surrounding the old windows, which then enabled their safe removal under controlled conditions. The new windows were fitted throughout all three floors, which had to be phased to ensure the installation of these windows were fitted immediately after each removal was complete and certified safe for the fitting team, this was to ensure we maintained a safe working environment
£316,000 value 9 weeks duration
Housing | Commercial | Heritage | Public Sector | Education