BROADWAY
E AV
BLOCK 2E POCKET PARK (BATIK) BLOCK 3 (CYPRESS)
B L IM L C IO N HIL ENS T EX
Design Diagramming So•ware Workflow Development: Lumion Grading & Drainage Materials Research & Sourcing Tools: Revit • Photoshop • Lumion • AutoCad • InDesign • Hand Drawing
H 9T YESLER WAY
All graphics by Audrey Maloney except where noted
MULTI-FAMILY RESIDENTIAL
YESLER TERRACE
2015-17 Sea!le, WA
Photo courtesy of Cypress
project summary
Client: Vulcan Status: Completed 2018
SITE CONTEXT Development of 400+ apartment units, 10,000+ SF commercial space, public hillside climb, and a pocket park a few minutes from downtown Sea!le. Replacing 1940s-era low-income housing units, the project maintained a substan"al affordable housing component. The landscape por"on of
Blocks 2E and 3 - hill climb, sidewalks, pocket park, and several large onstructure courtyards - was composed of networked public spaces at grade and a variety of sea"ng and circula"on spaces at private residen"al areas. MY ROLE During the course of this project my responsibili"es included, among others:
• Produce technical documents for en"re set following design direc"on • Handle Revit modeling and graphics • Check and contribute to grading solu"ons at stairs, ramps, plazas, etc. • Assemble conceptual plan"ng and more detailed on-structure plan"ngs • Assist with site walks/plan"ng and irriga"on punch list