Sheldon Addition: The Sheldon ARC

Page 1

THE SHELDON ARC UNDERGRADUATE CAPSTONE DESIGN

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

STUDENT CENTER MUSEUM


CITY OF LINCOLN CODE COMPLIANCE: •International Building Code 2018, (ARCH 430 using 2012) •2010 ADA Standards for Accessible Design •International Energy Code (IECC 2018) •National Electrical Code 2017 •International Fire Code 2018 •International Mechanical Code 2018 •International Fuel Gas Code 2018 •Lincoln Hydronics Code •Uniform Plumbing Code 2018

•Interior Bearing Walls: •N/A [code dictates ≥ 1 hr minimum where present; none present] •Non-Bearing Interior Walls: •2 Hours ≥ 0 hr minimum • UL - U415 •Floor Construction: •2 Hours ≥ 1 hr minimum • UL - DES J994

BUILDING DATA: •Project Name: Sheldon Museum ARC •Project Address: 12TH AND R STREET, LINCOLN, NE 68588 [40.817962157277705, -96.70445793734042] •Proposed Use: Artist Studio, Educational, Offices 40.817962157277705, -96.70445793734042] •Code Enforcement Jurisdiction: City of Lincoln, NE

•Roof Construction: •4+ Hours ≥ 1 hr minimum • Concrete Slab Construction (pg. A501) •Shaft Enclosure: •2 Hours ≥ 1 hr minimum • UL - U415

BUILDING CODE: •Occupancy Type: B - BUSINESS -[IBC 2012 Table 1004.1.2]

•Exit Corridor Walls: •2 Hours ≥ 1 hr minimum • UL - U415

•Construction Type: Type IIA -[IBS 2012 Table 503]

-{IBC 2012 Tables 601; Section 713.4 for Shaft Enclosure; Section 1023.3 for Exit Corridor Walls; Section 722.2.1.1 Concrete Fire Ratings]

•Zoning Constraints: Public University Campus •Zone: P - Public Use •Site Setbacks = N/A -UNL only has a guiding Master Plan, East face cannot extend past the existing Sheldon, West face must maintain Artifact Drop-Off, South face cannot damage Sheldon -[Lincoln Municipal Code, UNL Master Plan]

DRAWING LIST

•Permitted Uses: A building or premises owned by any governmental entity, including local, county, state, federal governmental units and their subdivisions, and in some form of public use, shall be permitted to be located in the P Public Use District. The provisions of this chapter shall not apply to land in private ownership, even if leased to or the subject of an easement to a governmental entity, or to describe the future location of such public uses. (Ord. 12571 §267a; May 8, 1979). -[Lincoln Municipal Code, See Page G002]

T000 - COVER PAGE G000 - GENERAL G100 - PRELIMINARY DESIGN A100 - SITE PLAN A101 - BASEMENT FLOOR PLAN A102 - FIRST FLOOR PLAN

•Lot Requirements: N/A

A103 - SECOND FLOOR PLAN A104 - ROOF PLAN

•Parking Requirements: Maintain Parking Spots; retaining 5 handicap spots in original locations, and providing alternative parking at Stadium Drive Parking Garage -[UNL Master Plan]

A200 - STAIRS A201 - LIFE SAFETY PLAN BASEMENT A202 - LIFE SAFETY PLAN FL 1

•Allowable Building Area: 37,500 SQFT -[IBC 2012 Table 503] •Actual Building Area: 24,814 SQFT

A203 - LIFE SAFETY PLAN FL 2 A300 - SECTION A A301 - SECTION B

•Allowable Building Height: 65’-0”; 85’-0” with sprinklers [applicable for this project] -[IBC 2012 Table 503, Construction IIA] •Actual Building Height: 33’-0”

A400 - NORTH ELEVATION A401 - EAST ELEVATION

•Frontage increase: N/A

A500 - WALL SECTION I

•Building GFA: 24,814 SQFT •Building NFA: 14,509.4 SQFT •Floor Area Ratio: 0.154 ( 15,475.3 SQFT Building Above Grade / 100,353 Parcel SQFT)

A501 - WALL SECTION II A600 - ISOMETRIC DETAIL A601 - DETAILS E & F

PLUMBING FIXTURES:

A602 - DETAILS G & H

•Water Closets: 3 Actual, 3 Required •Lavatories: 3 Actual, 2 Required •Drinking Fountains: 2 Actual, 2 Required •Service Sinks: 1 Actual, 1 Required

A700 - STRUCTURE

-[IBC 2012 Tables 2902.1 & 2902.2]

A703 - STRUCTURE PLAN FL BASEMENT

A701 - STRUCTURE TYPOLOGY A702 - ARCH DIAGRAM A704 - STRUCTURE PLAN FL 1 A705 - STRUCTURE PLAN FL 2

•Structural Frame: (Same as Exterior Bearing Walls) •4+ Hours ≥ 2 hr minimum • Concrete Sandwich Panel (pg. A501)

A706 - STRUCTURAL ISOMETRIC A800 - ENVIRONMENTAL CONDITIONS

•Exterior Bearing Walls: (Same as Structural Frame) •4+ Hours ≥ 1 hr minimum • Concrete Sandwich Panel (pg. A501)

CONTEXT MAP

COVER PAGE

FIRE RESISTIVE REQUIREMENTS:

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

A900 - VIEWS

SCALE: N/A

T000


This project is meant to investigate the role of program in relationship to an existing space on campus, the Sheldon Museum of Art. Main considerations look at relationship pairings to see the nature of and tension created within the interactions of design. Art and Architecture Museum and University Old and New Human and Built How are these considered and approached with deference or bias, what is established in an addition to compliment the Sheldon? By looking at this threshold intervention with a discerning eye we define how “place” is established within our proposed design. The specified programs of gathering and entry are necessary, however we must look beyond what is merely the minimum and determine what the program needs and how that vision comes to life in looking at what supplemental programs ensure the success of our project’s mission. Along with this, we began to consider and design the technical aspects of the project, incorporate what has been taught throughout our coursework in order to synthesize information learned, information learned. Studio: Integrate

PROJECT NARRATIVE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G001


P PUBLIC USE DISTRICT (Chapter 27.54)

P PUBLIC USE DISTRICT

This district is intended to provide a district essentially for mapping purposes which will identify real property presently owned and used by any governmental entity, including local, state, or federal governmental units, and put to some form of public use. This district is not intended to be applied to land that is used by governmental entities on an easement or leased basis if title to the land is in private ownership. (Ord. 17747 §1; October 16, 2000: Ord. 12571 §267a; May 8, 1979). 0’ 100’ 300’

This district is intended to prov mapping purposes which will id owned and used by any governm state, or federal governmental of public use. This district is no land that is used by governmen or leased basis if title to the l (Ord. 17747 §1; October 16, 20 8, 1979).

27.54.010 Scope of Regulations. The regulations set forth in this chapter, or set forth elsewhere in this title when referred to in this chapter, are the regulations in the P Public Use District. (Ord. 12571 §267a; May 8, 1979).

P PUBLIC USE DISTRICT (Chapter 27.54 )

27.54.010 Scope of Regulation The regulations set forth in th where in this title when referre regulations in the P Public Use 27.54.020 Permitted Uses. May 8, 1979).

This district is intended to provide a district essentially for mapping purposes which will identify real property presently owned and used by any governmental entity, including local, state, or federal governmental units, and put to some form of public use. This district is not intended to be applied to land that is used by governmental entities on an easement or leased basis if title to the land is in private ownership. (Ord. 17747 §1; October 16, 2000: Ord. 12571 §267a; May 8, 1979).

A building or premises owned by any governmental entity, including local, county, state, federal governmental units and their subdivisions, and in some form of public use, shall be permitted to be located in the P Public Use District. The provisions of this chapter shall not apply to land in private ownership, even if leased to or the subject of an easement to a governmental entity, or to describe the future location of such public uses. (Ord. 12571 §267a; May 8, 1979).

27.54.010 Scope of Regulations. The regulations set forth in this chapter, or set forth elsewhere in this title when referred to in this chapter, are the regulations in the P Public Use District. (Ord. 12571 §267a; May 8, 1979).

27.54.020 Permitted Uses. A building or premises owned including local, county, state, and their subdivisions, and in so be permitted to be located in t provisions of this chapter shall ownership, even if leased to or to a governmental entity, or to of such public uses. (Ord. 1257 27.54.030 Area Regulations.

27.54.020 Permitted Uses. A building or premises owned by any governmental entity, including local, county, state, federal governmental units and their subdivisions, and in some form of public use, shall be permitted to be located in the P Public Use District. The provisions of this chapter shall not apply to land in private ownership, even if leased to or the subject of an easement to a governmental entity, or to describe the future location of such public uses. (Ord. 12571 §267a; May 8, 1979). 27.54.030 Area Regulations. (Repealed by Ord. 17747 §2; October 16, 2000: prior Ord. 12571 §267a; May 8, 1979).

B-1

I-1

R-4

B-3

I-2

R-7

B-4

P

R-8

0’ 100’

300’

(Repealed by Ord. 17747 §2; October 16, 2000: prior Ord. 12571 §267a; May 8, 1979).

27.54.030 Area Regulations. (Repealed by Ord. 17747 §2; O 12571 §267a; May 8, 1979).

600’

REGULATORY REQUIREMENTS - ZONING

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

0’ 100’

300’

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

600’

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G002


The Sheldon Museum of Art is located on UNL’s campus, along the 12th & R intersection. The boundaries of the site intervention are limited by the constraints of existing campus buildings and being able to physically connect to the Sheldon in some aspect. Since placement is flexible, we analyzed how we wanted to integrate into the site, focusing on user circulation through campus and having the building become a part of the natural flow of campus, and leveraging under-utilized aspects of the site. The North parking lot has desired site qualities of connective moments towards main nodes of campus, the ability to bridge the divide between the public and private aspect of campus to a prominent community space, and potential to complement the Sheldon without detracting from existing site features. Looking at placement, we prioritized creating where design was lacking, deciding to maintain the sculpture gardens, and programmed outdoor green spaces, in favor of re-hauling the currently utilitarian plot of the parking lot. Designing to serve the community connection to campus and the Sheldon is best done through this North site which is seen in our site exploration and discussed in greater depth throughout our design process.

SITE CONDITIONS

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G003


SW corner detail

Texture, near and far.

SITE CONDITIONS - PHOTO ESSAY I

Continuous materiality from outside to inside.

Column split with a curtain wall

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

North window and ADA building access.

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G004


A perspective of the south facade, focused on the layers of the sculpture garden, looking at the ground form relationship.

Detail instance of the column meeting the plinth of the building, looking at the broken perpendicular grid.

Upwards perspective of the West facade entrance, focus on the built symmetry and the implied symmetry of the reflection.

Another broken grid instance, this is less aesthetic and more functional, but a drainage instance where even that element was designed.

Similar to the first, a Southwest perspective of the building, focused on the crossing planes of the sculpture garden.

Focused on the depth of space and change in materiality between architectural and landscaping elements.

The curve does not break the grid, but there is an extra geometry framing the column. While the light is less architectural, there is deference to the column.

There is a continuance of geometry from the exterior, shadowing the interior ceiling details, but slightly hidden with the reflection instance.

While the grid did not have to be broken for this insertion, it makes us question why this detail inspired such a move.

Even the tables align to the grid, and the materials of the environment become more polished with depth and distance.

SITE CONDITIONS - PHOTO ESSAY II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G005


EXISTING SHELDON INTERIOR STUDY

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G006


This set of paintings explores the Sheldon Art Museum and the physical and experiential inhabitation of a threshold. The physical artifact that resulted from these investigations activates the body and the spatial relationships of its context. While the intent of the artifact is for it to speak for itself, the artist’s description of each frame is as follows: Frame 1, The Sheldon from afar; Frame 2, looking up, approaching the threshold; Frame 3, the free-standing column; Frame 4, Behind the columns; Frame 5, The space between the grid; Frame 6, Looking up at the anomaly; Frame 7, Inside on a grid line; Frame 8, Looks at the difference; Frame 9, the other break in the grid. This artifact’s exploration focuses on the threshold space created where the grid is broken into two. The entrances of the Grand Hall pushed back from the facade are the only instances of the column grid being broken. The glass curtain walls fall halfway between two grid lines, the only place where the whole column is revealed. The space behind the columns and before the entrance is a unique and beautiful threshold. The paintings are acrylic on four-by-four inch canvases. While the representation of the threshold is highly saturated, it contrasts the monotone reality of the building. The building acts as a blank canvas where art is encouraged to escape from the galleries and flood all surfaces.

SITE CONDITIONS - THRESHOLD I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G007


By deconstructing the South facade, there is a better understanding of how the site reads in terms of hierarchy. This proved to be an exercise in dissecting how the human eye reads space in terms of order, depth, and the planar tension between related objects. The exterior was the easiest to piece apart, as there are so many instances of singularity of existing objects, and the separation between them is markedly objective. One of the main focuses which is highlighted by the use of laser cutting, is how even with planar instances, there is an undeniable massing to the perspective as a whole. It reads as unified and solid, not unlike the building.

SITE CONDITIONS - THRESHOLD II

The interior perspective modeled here shows the view from North to South, looking almost through and past the Great Hall. The focus is not the destination, but the series of thresholds one must cross in order to reach the end of the entry. While this perspective took twice as long to unravel as the other, much of that struggle must be attributed to the detailing of the intimate interior. As there is a great deal for the eye to process, the abstraction of representing the space as it exists weighed heavily against the nature of the exercise in chronicling an order, in a space where balance is defined by the third dimension.

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G008


SITE CONDITIONS - ANALYSIS

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G009


CLIMATE ANALYSIS - SUNLIGHT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: BAR SCALE

G010


CLIMATE ANALYSIS - WIND

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: BAR SCALE

G011


DRY BULB TEMPERATURE HUMIDITY COMFORT ZONE

79.125°

JANUARY FEBRUARY

69.125° 65 - 75°

MARCH

66 - 76°

APRIL

69 - 76°

MAY

71 - 81°

JUNE

74 - 84°

JULY

73 - 83°

AUGUST

69 - 79°

SEPTEMBER

66 - 76°

OCTOBER NOVEMBER DECEMBER

CLIMATE ANALYSIS - TEMPERATURE & HUMIDITY

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G012


ENVIR. SITE CONDITIONS - PSYCHROMETRIC CHART I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G013


ENVIR. SITE CONDITIONS - PSYCHROMETRIC CHART II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G014


ENVIR. SITE CONDITIONS - PSYCHROMETRIC CHART III

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G015


ENVIR. SITE CONDITIONS - PSYCHROMETRIC CHART IV

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G016


ELBPHILHARMONIE HAMBURG HERZOG & DE MEURON

HAMBURG, GERMANY

“In order to make the new Philharmonic a genuinely public attraction, it is imperative to provide not only attractive architecture but also an attractive mix of urban uses. The building complex accommodates a philharmonic hall, a chamber music hall, restaurants, bars, a panorama terrace with views of Hamburg and the harbour, apartments, a hotel and parking facilities. These varied uses are combined in one building as they are in a city. And like a city, the two contradictory and superimposed architectures of the Kaispeicher and the Philharmonic ensure exciting, varied spatial sequences: on the one hand, the original and archaic feel of the Kaispeicher marked by its relationship to the harbour; on the other, the sumptuous, elegant world of the Philharmonic. In between, there is an expansive topography of public and private spaces, all differing in character and scale: the large terrace of the Kaispeicher, extending like a new public plaza, responds to the inwardly oriented world of the Philharmonic built above it. The heart of the complex is the Elbphilharmonie itself.” https://www.herzogdemeuron.com/index/projects/complete-works/226-250/230-elbphilharmonie-hamburg.html

PRECEDENT ANALYSIS I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G017


CONVENT SAINT-FRANCOIS AMELIA TAVELLA ARCHITECTES

CORSICA, FRANCE

“Amelia Tavella has just completed the rehabilitation and extension of the Convent Saint-François, in Santa-Lucia di Tallano, Corsica. This partially ruined building from 1480, a historical monument, had been abandoned for a very long time. Nature has grown inside the building, Siamese nature slipped between the stones and then transformed into plant armor that protects against erosion and collapse. A fig tree is included in the facade. The wood, the roots become structural replaced the lime. An essential component of the historic monument, we have honored this nature which will have long protected the dormant building before its resurrection. Amelia Tavella has chosen to keep the ruins and replace the torn part, the phantom part, in copper work which will become the House of the Territory. The copper allowed a gesture of softness, it is feminine like stone. Unlike granite, however, it approaches its grandeur, by its preciousness and its propensity to capture the light.” https://www.archdaily.com/966028/convent-saint-francois-amelia-tavella-architectes

PRECEDENT ANALYSIS II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G018


JOSLYN ART MUSEUM SIR NORMAN FOSTER

OMAHA, UNITED STATES

“Clad in matching pink Etowah Fleuri marble from the Georgian quarry that supplied the original building, the new wing adopts a solid, unarticulated form with similar proportions to the existing museum. Linking the new and old wings, and set back from both, a glass atrium forms a new social space, providing restaurant facilities and a secondary public entrance. On the main level of the new wing are temporary exhibition galleries, lit from above by indirect, controlled daylight. The floor below comprises storage vaults, workshops, cloakrooms, a kitchen and a restaurant servery. At the front of the museum, the original access road and car park were reinstated to reinforce the principal axis and encourage use of the primary entrance. In front of the building there is space for an open-air amphitheatre – a venue for summer concerts – which would broaden the range of the Joslyn’s activities and give it a yet stronger community attraction.” https://www.fosterandpartners.com/projects/addition-to-joslyn-art-museum/

PRECEDENT ANALYSIS III

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G019


BECK HOUSE PHILIP JOHNSON

DALLAS, UNITED STATES

“Just North of Dallas’ city center lies a lesser known mansion designed in 1964 by infamous architect Philip Johnson. With six bedrooms and seven full bathrooms, this 11,387 square foot home in Preston Hollow, known as Beck House, is the architect’s largest home design. At first glance, the building appears less like a residence than a museum, office or opera house design, as its design clearly leans on lessons learned from his design for The David H. Koch Theater at Lincoln Center (formerly The New York State Theater), which was completed in the same year, and other public building designs completed by his firm. The home is distinguished by several colonnades, a sprawling library and a palatial double-staircase in a gallery room. The home sits on 7 acres which include a media house, modernist cabana, pool and tennis court.” https://www.adjaye.com/work/the-webster/

PRECEDENT ANALYSIS IV

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G020


PRECEDENT ANALYSIS - SITE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G021


Beginning with existing programs, we analyzed what those spaces catered towards, traditional galleries and a great hall with a focus on quiet contemplation; for private use, a couple of main offices, desks along with general storage sharing square footage with utility rooms. Administration expressed a desire for dedicated programmed community space, so we used this as a foundation for the addition, where students can be expressive in an artistic environment. The recent programs exist as supplementary for what the Sheldon has currently, as an addition, we integrated the proposed with the existing through program cultivation and floor plan layouts. The first floor is primarily a gathering space, connecting to an offshoot of the Sheldon’s Great Hall, here students can congregate informally, or the space can be furnished for formal events. Moving up the stairway, we come to a central hub where students can choose to enter the interactive art program, where hands-on learning and making occurs. Across the stairway, there are offices for staff that primarily work with student programming, and a small entryway before the offices to blur the divide between informal and formal. The basement directly connects to the storage system of the Sheldon, inspiring placement of an archive exposition area for students to view an interact with works of art. Additionally designed, a student lounge, for retreat and relaxation, but also inspiration; this would be student-driven space, where they choose how to make it their own.

USER REQUIREMENTS

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G022


PROGRAM ANALYSIS

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G023


Authenticity of form and representation is a high priority in this design, driving structural and materiality considerations. Our addition physically abstracts various driving principles of the Sheldon, for instance the three-centered arch motif, where scale is translated to fluctuate based on interior programs. The structural integrity of the arch is also pure, supporting the loads of our building where the Sheldon’s structure is primarily concrete concealed by a travertine façade. Concrete has a clear presence of façade and form, melding the divided approach taken in the precedent. By choosing to complement concrete with wood, we highlight the contrast of inorganic and organic materiality seen in both buildings, however wood in the previous situation is merely a veneer, whereas ours is true for detailing and furnishment. Where authenticity is seen in a tangible sense, there is also a social consideration of authenticity of connection, seen in prioritized campus integration. With Northeastern deference of form and entrance, we leverage the natural circulation paths of campus, and frame our building to receive this flow. Direct views through social programs create transparency where desired, bridging the divide between private and public space; indirect views made semi opaque by frosted glasses pique interest and further draw passersby into our building. It is our intention to serve the students of campus, as such designed a building which balanced site situation, design ideation, community integration, and program organization.

DESIGN STRATEGY

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G100


PROGRAM MASSING DIAGRAM

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G101


PROGRAM DIAGRAM

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G102


THRESHOLD COLLAGE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G103


The material palette shapes an intimate user experience while maintaining the connection to structural and visual authenticity. The primary materials chosen echo the design position statement, with an emphasis on being authentic where the Museum is not. For instance, the main structure consists of cast in place concrete, the travertine façade with dramatic arches is merely an artistic flourish. Our design took the form of three-centered arches and decided precast concrete would best express the transparency of structural nature. This idea of direct translation became constant throughout the building, where the Sheldon has wood veneer, we have wood flooring and details; where there is massing and few large windows, we have a gradient of transparency from opaque to translucency. Taking the inauthentic motifs of the Sheldon and bringing them into the open is a central concept of our material palette. Our addition does not hide behind a false façade, designed with the same attention to detail and construction as Philip Johnson, but it exists simply as it is.

MATERIAL PALETTE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G104


1

GATHERING Peeling back the facade of the Sheldon, posing the question of how students ideally interact with the space. What is public can also be experienced from a more secluded setting.

PROGRAM COLLAGES I

2

CREATING Considering the relationship of creation and connection to nature, how surroundings and transparency influence personal artistic expression.

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G105


3

ARCHIVE A prospective view of how an archive space can function to serve students displaying art in various styles. Opportunity for interaction with physical pieces, either three-dimensional or printed works.

PROGRAM COLLAGES II

4

LOUNGE Sneaking a peek into the life of students who discover a place of leisure, where they can shape the space to exist however they envision. A basic structure provides a framework, they cultivate program and expression as they wish.

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G106


THE DESIGN

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

G107


SITE PLAN

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: BAR SCALE

A100


BASEMENT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A101


1ST FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A102


2ND FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A103


ROOF PLAN

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A104


1

GRAND STAIR STAIRWAY WIDTH: 5’-8” ≥ 44” (IBC 2012 Section 1009.4, 1007.3) HEADROOM: 12’-0” ≥ 80” (IBC 2012 Section 1009.5) STAIR RISE: 7”≤ 7” ≥ 4” (IBC 2012 Section 1009.7.2) STAIR TREAD: 1’-11.25” ≥ 11” (IBC 2012 Section 1009.7.2) STAIRWAY LANDING: 6’-0” ≥ STAIRWAY WIDTH, 6’-0” here (IBC 2012 Section 1009.8) VERTICAL RISE: 6’-6” ≤ 12’-0” BETWEEN LANDINGS (IBC 2012 Section 1009.10) HANDRAILS: HANDRAILS ON EACH SIDE OF STAIRWAY, 38” ≤ 36” ≥ 34” FROM TREAD (IBC 2012 Section 1012.2) GUARDS: 42” ≥ 42” (IBC 2012 Section 1013.3)

STAIR PLANS AND SECTIONS

2

FIRE RATED STAIR STAIRWAY WIDTH: 5’-7” ≥ 44” (IBC 2012 Section 1009.4, 1007.3) HEADROOM: 13’-10” ≥ 80” (IBC 2012 Section 1009.5) STAIR RISE: 7”≤ 7” ≥ 4” (IBC 2012 Section 1009.7.2) STAIR TREAD: 11” ≥ 11” (IBC 2012 Section 1009.7.2) STAIRWAY LANDING: 6’-0” ≥ STAIRWAY WIDTH, 6’-0” here (IBC 2012 Section 1009.8) VERTICAL RISE: 6’-6” ≤ 12’-0” BETWEEN LANDINGS (IBC 2012 Section 1009.10) HANDRAILS: HANDRAILS ON EACH SIDE OF STAIRWAY, 38” ≤ 36” ≥ 34”” FROM TREAD (IBC 2012 Section 1012.2) GUARDS: 42” ≥ 42” (IBC 2012 Section 1013.3)

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/2” = 1’-0”

A200


LIFE SAFETY/EGRESS PLANS - BASEMENT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A201


LIFE SAFETY/EGRESS PLANS - 1ST FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A202


LIFE SAFETY/EGRESS - 2ND FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A203


SECTION A

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A300


SECTION B

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A301


ELEVATION 1

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 3/64” = 1’-0”

A400


ELEVATION 2

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 3/64” = 1’-0”

A401


WALL SECTION DETAIL I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/8” = 1’-0” [WALL] 1/2” = 1’-0” [DETAIL]

A500


WALL SECTION DETAIL II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/8” = 1’-0” [WALL] 1/2” = 1’-0” [DETAIL]

A501


The most prominent exterior connections of our building have expansive vertical fenestration instances, and other locations have the exterior wall break a singular line and flush into open interior or exterior spaces. Due to the nature of flexibility between spaces and connection points and details, we chose to use precast concrete slabs to achieve desired precise structural effects as well as act aesthetically. Since the basis of the design is modular, this makes precast an ideal strategy for managing cost effects while preserving the integrity of the details of the design. One such example is the repetitive nature of the arch connections to each other, the intersection at each grid point is crucial to the success of the overarching proposal; as such the detail subtly nests together to compliment the independent bolted plates for each arch unit, all of which are then welded together. Other technical details emphasize the nature of how the building interacts with the site, such as water run-off which then can be used in our building’s greywater system, or the footing instance which highlights the continuous insulation through the foundation elements. The window details are included since there are an atypical number of windows as part of the design, which could raise building performance concerns. As existing proprietary information, the channeled glass and double paned glass systems are proven successful designs that we integrated and improved upon for our fenestration objectives.

DETAILING

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A600


E

DOUBLE PANED GLASS

DETAILS E&F

F

CHANNELED GLASS

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/2” = 1’-0”

A601


G

ARCH TO PLATE

DETAILS G&H

H

ARCH TO ARCH

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/2” = 1’-0”

A602


Our primary structure is the prominent concrete arch motif throughout the project. Sitting at a 16’-8” column grid, we kept the intimacy of the grid as a feature, dimensioning for an authenticity of structure by manipulating the profiles and geometry of the arch. Since the scaling of a singular dimension of the arch fluctuates, we determined load transference would be most efficient at floor plate instances. The arches rest along the floor plates, and the concrete slab helps equalize the load to transfer to the next floor’s arches. The interior walls incorporated are entirely nonstructural as it would be redundant in design, only serving to raise construction costs unnecessarily. The only other structural element of the interior is the shear stability provided by an off-center core placed along the West end of the building, along the “primary” axis as it is the longest edge of the building. Our basement has 12” thick concrete walls for our foundation, and simple spread footings resting under each column grid point sitting at 4’x4’x2’. The underground perimeter of the building has continuous spread footings. These efforts, along with the considered load of the building only necessitate a shallow foundation as the most desirable.

STRUCTURE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/32” = 1’-0”

A700


STRUCTURE TAXONOMY

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/4” = 1’-0”

A701


STRUCTURAL CONCEPT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/4” = 1’-0”

A702


STRUCTURAL PLAN - BASEMENT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A703


STRUCTURAL PLANS - 1ST FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A704


STRUCTURAL PLANS - 2ND FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A705


STRUCTURAL ISOMETRIC

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A706


Looking at sustainable strategies, we used the information from the city’s environmental data generated in Climate Studio’s psychrometric chart to prioritize various sustainability moves throughout various seasons. Not all strategies are beneficial for each season, but we made the most effective moves by prioritizing the highest measured actions throughout the annual year, heating & cooling, sun shading, and adaptive comfort ventilation— the last of which brings us to our next process. Our project uses an underfloor air distribution system (UFAD). This achieves a clean ceiling plane that celebrates the connection between the precast concrete arches and the structural concrete floor slab. Using the pressurized floor plenum method over ducted supply is more efficient, has lower installation costs, is self-balancing, decreases noise travel, and easily rearranged when needed. Because the programs on all three levels of our projects serve different purposes, each floor has its own air distribution unit. Each floor is divided into three zones, done by creating sub plenums. The zones are outlined in plans, restrooms alone, and then split into public and private spaces. Outside air is brought from the west façade and travels down a vertical chase, adjacent to the mechanical room to serve all three air handling units. The exhaust is expelled from the roof, through a vertical chase adjacent to the mechanical room. Electrical and communication wiring run through the raised floor plenum and travel between floors in conduit that runs through the hollow intersections of the precast concrete arches.

ENVIRONMENTAL SYSTEMS - SEASONAL

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/8” = 1’-0”

A800


BASED ON CLIMATE CONSULTANT STRATEGIES

SUSTAINABLE DESIGN STRATEGIES

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A801


HVAC SYSTEMS DIAGRAM

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A [ISO] 1/8” = 1’-0” [SECTION]

A802


HVAC PLAN - BASEMENT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/6” = 1’-0”

A803


HVAC PLAN - 1ST FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A804


HVAC PLAN - 2ND FLOOR

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A805


GREYWATER SYSTEMS DIAGRAM

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A806


REFLECTED CEILING PLAN - ELECTRICAL/MECHANICAL

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: 1/16” = 1’-0”

A807


LIGHTING STRATEGIES

BEAU’S BEAUS UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 03-11-2022

SCALE: N/A

A808


One of our main concerns moving ahead with our design was having transparency in the design, to have an open welcoming nature the Sheldon does not express. A motif of gradient opacity emerged, and from there we knew we needed to explore fenestration that would not be uncomfortable for users, or completely draining from an energy or economic standpoint. Our analysis began with window types, knowing double paned glass to have better performance than single pane glass, we began to research further alternatives, discovering channeled glass, which has insulation properties in addition to being more effective at blocking excess sun lighting. Starting with a radiation study, we determined the East and South sides would be the most susceptible to harsh light, and so implemented an overhang on the East, while using the Sheldon on the South. These main architectural moves help set a foundation, moving forward to the glass study we determined channeled glass to halve the original instances of lighting concerns. Knowing building performance could also be improved upon with glass finishes, we further decided to sandblast the glass, which supports our narrative of spaces maintaining privacy without compromising accessibility to natural light, enhancing user experience and productivity levels.

BUILDING PERFORMANCE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A809


Cha

nne

Do

led

ubl

Sin

gle

Cha

nne

Do

led

ubl

Sin

gle

1

Pan e

- Si

ngl

eH

eP ane

- Si

ngl

eH

Gla

ss

- Si

ngl

Pan e

eH

- Do

ubl

eH

eP ane

- Do

ubl

eH

Cha

nne

Gla

ss

- Do

ubl

eH

Do

ubl

eig

ht

Sin

gle

eig

ht Cha

nne

eig

ht Do

ht

Sin

gle

eig

ht

eig

ht

MEASURABLE BUILDING PERFORMANCE

led

ubl

eig

EAST WINDOW STUDY

led

2

Pan e

- Si

ngl

eH

eP ane

- Si

ngl

eH

Gla

ss

- Si

ngl

Pan e

eH

- Do

ubl

eH

eP ane

- Do

ubl

eH

Gla

ss

- Do

ubl

eH

eig

ht

eig

ht

eig

ht

eig

ht

eig

ht

eig

ht

SOUTH WINDOW STUDY

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A810


A general sector concern regarding new construction in architecture is carbon emissions during construction. Though concrete is one of the largest contributors regarding building materials, there are alternatives for precast options, low carbon designs which we would advocate the use of. These various alternatives are carbon negative, as they use ground slag, a waste product from steel production instead of cement, while carbon is consumed during the developmental process. Carbon emissions can be cut up to 48% from baseline practices (current 1:1 ratio of concrete produced to carbon emitted). Wood is another main material we are incorporating into the design. Though not as prominent as concrete, this authentic material is the greenest building component easily available in this region, as such has a low carbon footprint while bringing an element of organic comfort to the interiors of our addition. Another concern we focused on anticipating is the impact on the green space of campus. Though the proposed site is a paved lot with minimal green space, our design looks at adding to the campus’s square footage for outdoor recreation and leisure, acknowledging that minimizing or even maintaining the current situation to be constrictive. Our intervention at the Northeast corner carries the most weight on site as it connects to a main intersection of campus near the Learning Commons Library. Here, appeal is of immense importance and is a foundational opportunity to pique interest in our scheme’s programs.

ENVIRONMENTAL IMPACT

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A811


PERSPECTIVES

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A900


EXTERIOR II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A901


INTERIOR GATHER

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A902


INTERIOR ART ROOM I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A903


INTERIOR ART ROOM II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A904


INTERIOR ARCHIVE I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A905


INTERIOR ARCHIVE II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A906


INTERIOR LOUNGE

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A907


INTERIOR OFFICE I

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A908


INTERIOR OFFICE II

THE SHELDON ARC UNIVERSITY OF NEBRASKA-LINCOLN CAMPUS

ARCH 411 - SECTION 003 STEP INTO THE FRAME BEAU JOHNSON

KATHLEEN O’GARA AUDREY HUSE 05-04-2022

SCALE: N/A

A909