NOV 26 2022
WEEKEND
GUARDIAN
$3.20
COLLEGE BUILD UNDER WAY
Small stumbling block Principal Ross Preece (pictured) is rapt that Ashburton College’s rebuild is finally starting to happen – after more than six years of planning. Block one is under way but escalating construction costs leaves the future of block three uncertain, though Preece isn’t bothered and is taking it one step at a time. FULL STORY, P2 TH BOROUGH 150
Ashburton’s oldest school celebrates
Happy
place
P12-13
SANTA’S LITTLE HELPER
PSSSST: Santa needs assistants
P4
P15-20 Ph 03 307 7900 or scan this QR code to subscribe:
4 DAYS OF UNMISSABLE DEALS OVER 80 INCREDIBLE DEALS
25-28 NOVEMBER
West Street, Ashburton PHONE 03 308 5119