HOTTER SUMMERS, INCREASED FLOODING, SCORCHED WILDLIFE, DRY PADDOCKS TOO LITTLE, TOO LATE?

![]()

HOTTER SUMMERS, INCREASED FLOODING, SCORCHED WILDLIFE, DRY PADDOCKS TOO LITTLE, TOO LATE?



How can integrating a cyborg blue-green infrastructure edge into a new urban public domain, increase stakeholder understanding of resilience in the bays?
“COP26
MUST BE A TURNING POINT. WE MUST ACT NOW WITH AMBITION AND SOLIDARITY TO SAFEGUARD OUR FUTURE AND SAVE HUMANITY.”
CURRENT PROJECTIONS WILL SEE TEMPERATURE INCREASE “IN EXCESS” OF 1.5C TO 2C ABOVE PRE-INDUSTRIAL LEVELS.
BETWEEN 2013 AND 2021 SEA LEVELS HAVE DOUBLED COMPARED WITH THE RISE FROM 1993 TO 2002

CURRENT SEA LEVEL RISE PROJECTIONS



as humans we have re-etched and botched this landscape

despite this, there is still hope we can achieve this through edge a BGI hybrid edge...

we need to educate people whilst creating climate resilient landscapes to help heal mother nature and the toxic sludge of industry
FINDINGS
Potential site opportunities for the sites unique condition, orientation and natural processes of the area are outlined below:
RECONNECT OPEN GREENSPACE UNLOCK FORESHORE INTERACTION
• Re-establish ecological connections
• Hybrid blue-green infrastructure elements BGI
• Reconnect community to the waterfront
• Frame the historical site views to emphasize site peninsula

CREATE A SENSORY LANDSCAPE
• Create refuge from ultra-urban landscapes
• Habitat hybrid elements weaved into wetland corridors
IMPROVE CLIMATE RESILIENCE
• Foster an educational landscape on climate change and sea level rise
• Improve stakeholder understanding of BGI


EMBRACE EDGE CONNECTIONS
• Retain deep water docking
• Some of the last wharfage in Sydney Harbour
• Improves hybrid wetland processes
CELEBRATE SITE MODIFICATION
• Maintain marine architecture
• Educational opportunities
• Original headland to support urban precinct


JUXTAPOSITION OF PRE + POST INDUSTRY
• Restore site outlook, follow CPTED for eyes on the street
• Opportunity for cyborg headland park to contrast flatness





















Modify Glebe Island to incorporate resilient blue-green infrastructure corridors on-site


Reconnect and establish habitat areas to disassociate from the ultra-modified industrial landscape


Follow circular design principles + provide educational opportunities for stakeholders to celebrate site elements







ROADBLOCK: DEEP WHARF EDGE CONTAMINATED SOILS

ROADBLOCK: DEEP WHARF EDGE SOIL LEACHING
RESOLUTION


BENEFITS: RETAINED DEEP WHARF MOORINGS MAXIMISING GLEBE ISLAND FOOTPRINT
Imagery sourced from, "Glebe Island — Pyrmont History Group". Pyrmont History Group, 2021 https://aggregatetechnologies.com/concrete-wharf-demolition/ All Graphics sources from the Noun Project, https://thenounproject.com/ 13-10-2021

LETS PEEL BACK THE LID...

SOIL SAMPLE



SOIL SAMPLE



SOIL SAMPLE







PHASE I
PHASE II
PHASE III
BREAKING GROUND

COMMENCING PHYTOREMEDIATION
CREATE WETLANDS TO MITIGATE RUNOFF








TO CUT DOWN...
TO REMEDIATE...



ACCUMULATION IN SHOOTS


SUNFLOWER
• Arsenic
• Cadnium
• Nickel
• PAH
• Zinc
ROOTS EXTRACT TO SHOOTS
UPTAKE OF POLLUTANTS


MARIGOLDS PIGS FACE
• Arsenic
• Cadnium
• Nickel

• Copper
• Cadnium
• Zinc
• Copper
• Lead
• Zinc

• Alluminium
• Arsenic
• Lead
• Maganese

• Zinc
DESTROY PLANT BIOMASS
PHYTOREMEDIATION TO EXTRACT 85% OF HEAVY METAL CONTAMINANTS


PHYTOREMEDIATION PROCESS IN ACTION

DESIGN CIRCULARITY - CYBORG HEADLAND


STAKEHOLDER INTERACTION - CIRCULARITY









I PHASE III
IMPROVING CLIMATE RESILIENCE

BRING PEOPLE BACK TO THE EDGE
CREATE CYBORG BGI TO TEACH






INCORPORATING BGI INTO PUBLIC DOMAIN
• Bringing BGI into the public domain follows COP26 goals
• Improves site resilience to climate change and sea level rise
• Creates opportunity for Glebe Island to set the precedence for brownfield renewal
OPEN UP AND RECONNECTING SITE
RECYCLED SLABS AS BARRIERS
CONSTRUCT SEA WALL

Sea Wall Erected Peel Back Wharf Concrete Cap - Phytoremediation Human Edge Interaction

WATERPROOF MEMBRANE ADDED TO MANAGE LEECHING
REUSING SITE MATERIALS IN CONSTRUCTION
WETLANDS OPENED TO PUBLIC

Regrading Post Phytoremediation - Initial Wetland Planting

WORLD CLASS FORESHORE WALKWAYS OPENED
MARITIME DESIGN CELEBRATED IN MATERIALITY
DESIGN FOR ALL - BILLABONG SWIMMING AREA
Edge of Urban Domain
Maturing Hybrid Wetland Landscape - Established Habitat

Human Interaction with Wetland - Recreation + Educational



Avicennia marina
Mature Height 3-10m

Aegiceras corniculatum Mature Height 1-15m


Excoecaria agalloch Mature Height 1-15m


Tecticornia spp
Mature Height 0.3-0.5m
Salicornia europaea
Mature Height 0.3-0.5m

Mature Height 1.2m

Mature Height 3-10m

Mature Height 0.1-0.9m

Sporobolus africanus
Mature Height 0-1m

























PHASE I PHASE II
INTEGRATE SITE FUNCTIONS

RE-ESTABLISH SITE TOPOGRAPHY

CREATE SITE HIERARCHY - CPTED



POST PHYTOREMEDIATION
STORING CONCRETE SLABS
FOLLOWING CPTED GUIDELINES

Concrete Landscape - Open Recreation

WALKWAYS OPENED
DESIGN FOR ALL - BILLABONG SWIMMING AREA
IMPLEMENTING RECYCLED ELEMENTS



TERRACED WATER TREATMENT FUNCTIONING
CLEANLINESS TARGETS HIT - BILLABONG SWIMMING AREA
STACKED CONCRETE HAS NATURALISED





TOO LITTLE, TOO LATE?