By 2050, the population of metropolitan areas is predicted to surge from 3.4 billion to 6.3 billion. Although often viewed as an economic phenomenon, urbanisation too, signifies an ecological revolution for mankind. Understanding the melodramatic changes in our relationship with nature, space and materials, is key to sustainable progress.

Sydney Metro West (Construction 2020)

Metro

The seven proposed metro stations for Sydney

have been confirmed at Westmead, Parramatta, Sydney Olympic Park, North Strathfield, Burwood North, Five Dock and The Bays. Construction started in 2020, Sydney Metro West will make it faster and easier to get to Parramatta from both the east and west. This frees up capacity on the existing suburban rail to the west, increasing the reliability of services to and from Greater Western Sydney areas like Blacktown, Penrith and the Blue Mountains. Most metro stations are well connected with train stations, making it convenient for commuters to change services.The proposal for Sydney Metro Greater West[2] has been approved, and the construction, too, started in 2020, making it easier to commute between Western Sydney to The Bays Precinct through Metro. Having a Western Sydney Internation Airport station, it bounds to bring more tourism into Sydney CBD, or even, The Bays Precinct.

The nearest train station from The Bays Precinct is the one located in Sydney CBD – Central/Town Hall station.

Macquarie
Parramatta

OCT 2021 - MAR 2025

Tunnel & Excavation

SEP 2027

Completion

JUN 2028

Completion

dEC 2028

Ready to go!

dEC 2027

Completion

MAR 2028

Completion

Western Sydney Parkland

2.5km
Bankstown
Sydney Olympic Park
Macquarie Park
Chatswood
Rockdale
Towra Point
Blacktown
Badgerys Creek
Belrose + 5km 7.5km

M 3 PRINCIPLES

DERELICT INFRASTRUCTURE MONOLITHIC LANDSCAPE

ECOLOGICAL:

Restore ecological damage caused by industrialism.

INFRASTRUCTURE:

Reintroduce industrial functions for a combination of decentralised energy production and material resources.

EDUCATIONAL:

Render knowledge to public on the different industrial services and functions.

METABOLISM

HABITAT

OUTCOME

INSECT HABITAT NURSERY

URBAN LEd?

L ANdSCAPE LEd?

dEvELOPMENT LEd?

OR.....

TECHNOLOgY LEd?

1

REAdYINg

STAgE 2

REvITALISINg

Planet • People

ZONE A: Electrokinetic Remediation

2022 - ??

ZONE B: Stockpiling

2022 - 2023

ZONE A: Soil Washing

2022 - 2026 Planet • People • Profit 2027 - ??

STAgE 3

RE WARdINg

Event: Educational Tour

ZONE B: Phytoremediation

2023 - 2027

Event: Sowing & Harvesting Festival

Overall Construction Starts: Jan 2027

Event: Educational Tour, Kite Festival, Cycle Festival, Skate Festival, Vivid Sydney

White Bay in Danger!

Soil Washing

Electrokinetic Remediation

STA g E 1

READYING

STAgE 1: ELECTROkINETIC REMEdIATION

2021 - ??

Contaminant treatment system

Conditioning of anode solution

Contaminant treatment system

Conditioning of cathode solution

Fluid circulation system Fluid circulation system Anode

STA g E 2

REVITALISING

2021 - 2026

STA g E 1

READYING

The proposal for the Metro West stated that the spoil or construction waste from excavating and tunnelling works would be transported to stockpiles within the Westmead metro station and The Bays Station construction site.

STA g E 2

REVITALISING

2023-2027

Phytoremediation will incorporate a palette of annual, fast growing plants. The plant species were selected from phytoremediation research and were proven to remove toxins. Plant selection was further influenced by matching appropriate species with the known toxins found on site, as well as included plants which have notable bloom and foliage qualities.

PHYTOREMEdIATION PLANTINg STRATEgIES

Trees, shrubs and groundcovers will be planted in groups. They will be grouped according to their maturity time and stages. This will allow events for sowing and harvesting.

Certain insects, such as grasshopper, feed on toxic plants in order to protect themselves from predators.

Phytoremediated plants will be use as biochar in place into the gasifier in White Bay Power Station to generate renewable energy.

3-6 MONTHS

6-12 MONTHS

1 YEAR ABOVE

Aussie rambler
Dianella ‘Cassa Blue’
Banksia
Gymea Lily
Juncus effusus
Lomandra
Cupaniopisis
Acacia meansii
Swamp she oak

STA g E 3

REWARDING

Balmain and Rozelle compromise of ridge kind of topography that faces White Bay

+ Able to look into each facilities from the walkway + Opportunities to see and learn in a safe environment

+ Better daylight condition

Pedestrian walk/tour

Gasification for Renewable Energy

Commercial + Nursery

Skate/Cycle Park

Recreational Space

Nursery/Commercial + Underground Metro Rooftop

Material Resouce Facility

Material Resouce Facility Access to Rooftop
Promenade
Underground Metro Station
Cycling Lane
Alfresco Dining
Lookout

Skate/Cycle Park + Kinetic Play

Viewing Spot

Material

Resouce Facility

Access to Rooftop

Rooftop

Recreational Space

Material

Resouce Facility

BB 1:250

Skate/Cycle Rooftop Park

Entryway Towards Roof

Rooftop Park

Material

Resource Facility

CIRCULATION

Circulation access is a important factor to be considered for safety. Therefore, industrial access should be separated from public access.

All buildings are well connected through the open roof.

Participate

WHITE BAY SCHOOLS

Educational & Excursions

gLEBE ISLANd RESIdENTIAL

THE BAYS TECHNOLOgICAL HUB

WHITE BAY TERMINALS MARINE INdUSTRY

ROZELLE & BALMAIN RESIdENTS PYRMONT RESIdENTS &

2050 TARGET:

~70% RENEWABLE ENERgY

~75% RECYCLINg RATE

NET-ZERO EMISSION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.