IT Systems Analysis and Design Chapter 1 1. An information system consists of A) Software, database, and manual processes 2. Two important goals or steps within Core Process one are ____ and _____. B) Identify the solution objective; obtain project approval 3. Designing the database schema is included in which Core Process? D) 4 4. An information system development process that emphasizes flexibility to embrace change is called _____________________. D) Agile development 5. Method signatures are included in which diagram? D) Design class diagram 6. The primary difference between a work breakdown structure and a work sequence draft is that the work sequence draft shows ___________________. D) The sequence of tasks 7. The purpose of a use case is to _______. B) Identify a business event that requires system action 8. In a workflow diagram, the arrows that cross the center line are used to identify what? D) Screens and Reports 9. What is the purpose of an iteration recap? B) To review the project processes 10. The purpose of a class diagram is to _______. D) document the information requirements in the new system 11. Two of the primary elements that are included in a Work Breakdown Structure include: D) list of tasks and estimated effortPoints Earned: 4.0/4.0 12. What is the single activity that usually requires the most time during a project? A) Programming 13. Performing in-depth fact finding to understand details is done as part of which Core Process? D) 4