Cal Poly Pomona Submittal

Page 1

AMIR ABOUD FEATURED WORKS | 2022-2024 Orange Coast College

5

12

12

MASTER BEDROOM

5

MASTER CLOSET FRAMING SECTION C CALLOUTS 1. PRE-FAB TRUSSES BY OTHERS 2. (E) MOMENT FRAME TO REMAIN (NO CHANGE) 3. (E) & (N) EXT. WALL LAYERING TO BE: (N) DBL WITH STUCCO TO MATCH EXISTING, POST APPLIED SHEET MEMEBRANE, OSB PER STRUCTURAL. SEE SHEET A.300 DETAIL 3 4. (N) SLAB TO LEVEL WITH EXISTING SLAB. SEE SHEET A.300 DETAIL 14 5. (N) FLUSH B.M. PER STRUCTURAL 6. (E) GTJI FLR JOIST TO REMAIN 7. (N) TJI HANGER PER PLAN 8. (E) 4X4 PST TO BE REMOVED 9. (E) DOUBLE TOP PLATE 10. (N) PT SILL PLT

SEE SHEET A.102 FOR MORE INFO REGARDING GRADING

FAMILY ROOM

11. (E) 2X BLCKNG 12. (N) WEEP SCREED. SEE SHEET A.300 DETAIL 2

NOTE: PROPER SHORING IS REQUIRED PRIOR TO REMOVAL OF BEARING WALL

13. 1/2" GYPSUM BOARD 14. R49 INSULATION. SEE SHET A.401 TITLE 24 CALCS FOR FULL INSULATION VALUES

SEE SHEET A.102 FOR MORE INFO REGARDING GRADING

15. (E) SUB FASCIA. 16. (N) SPLASH BLOCK - SLOPE DRAIN AWAY FROM BUILDING SEE SHEET A.300 DETAIL 9

SLOPE TO DRAIN

17. (E) PLYWOOD SUBFLOOR 18. (E) POST TENSION SLAB

A section I made for a home remodel in 2021

FRAMING SECTION C

SCALE: 3/32” = 1’-0”