Skip to main content

Allen Tucker's Architecture Portfolio

Page 1

A L L E N

T U C K E R

ARCHITECTURE DESIGN PORTFOLIO


SHALLOW RELIEF The ability to think abstractly is a skill learned in the first year of architecture school as a foundation for compositional thinking. The shallow relief project uses thin layers of museum board to exercise our ability to abstract space in a compositional field.

Regulating lines from forms create implied space and play into a circulation that’s controlled and influenced by the composition. Shown is a hybrid image combining a digital rendering of the model and an analog field-shading drawing. By layering the drawings, their strengths are able to play off of each other and tell a story of their shared composition.

1


2


ANALYTICAL GEOMETRY

This analog perspective drawing technique utilizes the inherent relationships between a plan and elevation to create a mathematically correct viewport.

Using precedents, the purpose of this project is to strengthen our analog drafting skills through an analytical drawing technique. This provides a unique understanding of the building.

two smaller drawings (left) are of Frank Llyod Wright’s Pope Lehigh House larger drawing (above) is of UNCC’s Colvard Building

3

6

3


ROOF soil and sedum green roof

WALL SECTION

fabric filtration membrane 25mm-thick egg-crate water drainage layer 5mm-thick water retention mat 140mm-thick extruded polystyrene insulation 6mm-thick liquid-applied rubberized asphalt waterproof membrane

The 150,000 sq. ft Des Moines Library by David Chipperfield Architects features a two-story high, copper mesh, unitized curtain wall. This and other features allow the building to use 30% less energy than a conventional building.

450mm-wide gravel strip 355mm-thick reinforced concrete slabs placed on regular 9m grid supports

PARAPET 3mm folded aluminum coping bolted to curtain wall frame two 18mm-thick exterior-grade wood pieces anchored to concrete parapet 75mm vertical rigid insulation rubberized asphalt waterproof membrane applied as a liquid on roof and up the parapet 380mm x 225mm reinforced concrete parapet upstand two 12mm pieces of wood

To understand how the building operates, cutaway axonometric wall sections were constructed. These sections – along with detailed notes - would tell the story of the building’s materials and their role in the overall assembly.

waterproof flashing dressed down over plywood and lapped over roof membrane

SECOND FLOOR along the interior’s perimeter is an array of 6-meter spaced, 400mm-diameter concrete columns that support the floor and roof edges 124 x 76mm aluminum box section frames hold the glass panels on the first and second floor an aluminum mullion is formed by the interlocking extruded channels of the aluminum frames steel pedestals are glued to the concrete slabs and elevate 600mm x 600mm access floor panels up 400mm. this void space forms a supply air plenum in this forced-air air conditioning system. each steel mullion hooks over a support angle with two steel hangers that are bolted into place every 4’, a curtain wall support angle is fixed into a 76mm-deep pocket in the concrete slabs 460mm-thick reinforced concrete slab

GLASS WALL okatech is a triple-glazed insulating panel unit which wraps the entire facade, one 4’ x 13‘ panel at a time the second innermost glass panel has a low-emissivity coat, which minimizes infrared light coming through without reducing visual continuity an expanded copper mesh exists between the two outer layers of glass, blocking 69% of the sunlight and admitting just 7-22% of the sun’s heat, depending on the sun’s angle. from the inside, the mesh is quite transparent due to its inner face being in shadow. the outermost 5/16” glass panel is low in iron, allowing for greater visual clarity of the park from inside

GROUND LEVEL FLOOR continuous gravel drainage strip extends 600mm beyond facade steel channels are cast into concrete slab and support the above cantileavered anchor supports steel hangers hook over support angle and are bolted into place 4’-long, 1.5”-thick glass fiber reinforced concrete panel secured to steel mullions of glass panels 4’-long perforated galvanized steel sheet 75mm-thick galvanized pressed steel insulated panel 2”-thick foam board insulation goes below grade

BASEMENT spray foam insulation on underside of ground-floor slab a regular, 9-meter spaced grid of 600mm-thick concrete columns are the primary support for the library’s floor slabs.

0’ 10’ 20’ 30’

50’

100’

150’

200’

250’

300’

waterproofing tanking membrane 460mm-thick reinforced concrete wall

Plan & Section 1” = 130’ Cutaway Axonometric 1” = 8’

foundation drainage pipe 460mm-thick reinforced concrete slab continuous, reinforced concrete footing

4


A

5


TRIANGULATION On a 30’ x 150’ site, ten modular units differentiate themselves through their triangular shape. A gridded network places the units and implies spaces that afford gathering.

These angles provide the units with a distinct character which unifies and details the assembly and creates a curious, playful environment to explore. Sharp angles may be formed, which control movement and views of the spaces ahead, creating a continual experience from any point.

9.5’

1’

SECTION A

A

6


ILLUSTRATING CONSTRUCTION

Verticals 2 - 7 1/4” x 1“ x 1/2” 5 - 7 1/4” x 1/2” x 1/4” 2 - 7 1/4” x 1/4” x 1/4”

As part of the semester’s final project, construction manuals for the wire hand box were composed. Every detail had to be presented with clarity. Although a lengthy process, this project exercised our ability to communicate our design intent through the construction procedure.

Horizontals 5 - 8” x 1/4“ x 1/4” 8” x 1/2“ x 1/4” 8 3/4” x 1/4“ x 1/4” 9“ x 1/4“ x 1/4” 11 1/2” x 1/4“ x 1/4” 12 1/4” x 1/4“ x 1/4” 15” x 1/2“ x 1/4” 15 3/4” x 1/2“ x 1/4”

7


2

1

3

3/4”

1/4”

Note: Pieces are secured with clamps and wood glue.

5 5

4

6 12 1/4” x 1/4” x 1/4”

1/2” 3/4”

1/2” 1/4”

15” x 1/2” x 1/4”

9 9

8

12 1/4” x 1/4” x 1/4”

This is what has been constructed thus far.

10

1/4”

7 1/4” x 1/2” x 1/4”

With these two in place, Corner 1 is complete.

7 1/4” x 1/2” x 1/4” 8” x 1/4” x 1/4”

15 3/4” x 1/2” x 1/4” 7 1/4” x 1” x 1/2”

7 7

2 - 8” x 1/4” x 1/4”

Now, to build the frame that will hold the wire hand.

11

12

11 1/2” x 1/4” x 1/4”

3/4” 3/4”

3/4” 1/4”

1/2”

Note: This is the 8” x 1/4” x 1/4” piece from Step 2

8” x 1/4” x 1/4” 3/4”

7 1/4” x 1/2” x 1/4” 8” x 1/4” x 1/4”

Corner 2 is complete.

13 13

14 14

17

16

15

7 1/4” x 1/2” x 1/4”

Slide the frame onto the rails created by the horizontal pieces of the already built structure.

1/4”

8 3/4” x 1/4” x 1/4” 1/2”

9 3/4” from corner 8” x 1/4” x 1/4”

The frame is now complete.

18

19 8” x 1/2” x 1/4”

This next piece rests in the corner of two horizontals

7 1/4” x 1/4” x 1/4”

Corner 3 is now complete.

20

7 1/4” x 1” x 1/2”

For the final corner, two 7 1/4” pieces are locked into two corners. 1/2”

One corner remains.

7 1/4” x 1/4” x 1/4”

Final build.

8


BOUNDING BOX The bounding box is a fusion of everything compositional learned in first semester and begins with the wire hand inside: The wire hand is a gesture discovered during hand studies. The surrounding box echoes the gesture of the hand that it houses. With the vellum cladding, I capture various viewports of the gestural wire hand and dimensionalize the box by providing new fields within which space exists. At the end, groups display their boxes together, to consider how their compositions mix or conflict.

9


scale: 1” = 16”

10


CAMP LOOKOUT Camp Lookout Elementary School redefines what community means for a school. The main circulatory path is a circle that runs around and directs views into the community courtyard. Steel is utilized in the building’s forms and resulting programs, creating a genuine steel building.

site exit entry

AUDITORIUM (4500 sqft.)

CLS GRD. 4

Path crosses over street (from bus stop) CLS GRD. 4

CLS GRD. 4 CLS GRD. 4

Mullion-framed storefront windows

CLS GRD. 4

CLS GRD. 3

bus drop-off

CLS GRD. 3

CHECK-IN

path from patio to path

CLS GRD. 3

small garden (in pot) for each room

CLS GRD. 3 stairs down onto grade

CLS GRD. 3

8’-wide circular pergola

ADMIN 4000 sqft. central courtyard

bookshelves (library)

outdoor verandas

MEDIA CENTER

CLS GRD. 1 CLS GRD. 1

PREP

CLS GRD. 1

BR

slope down to grade

CAFETERIA

BUS STOP

CLS GRD. 1 CLS GRD. 1

CLS GRD. 2

A

CLS GRD. 2 CLS GRD. 2

BUS STOP

NEIGHBORHOOD

0’

500

1000

CLS GRD. 2

CLS GRD. 2

U10-sized soccer field

2000

SITE

0’ 5 15 25

LOCATION

11

0’

2500

5000

10000

15000

SECTION A - 1” = 12’

GYM (4500 sqft.)

50

100

200

300


standing seam metal decking

attached via panel clips

6”-thick purlins

galvanized single-slope steel frames

concrete shear wall raised floor concrete stands hold frames concrete slab-on-grade

door, window apertures, exterior stairs

mullion->roof steel panels

mullions

metal stud wall w/ clerestory openings exterior cladding/finish

12


ELEVATED ARTS

0 10 20

Extrude

13

50

Sugar Creek’s “Elevated Arts” Center embraces its creative roots by reflecting the area’s culture. Outdoor space is divided by extrusions from the existing building, taking the form of planar elements. These planes then take on arts-based programs, including a performance space, social areas, workshops, and a gallery.

100

Divide

Carve


Ground

0 10 20

50

100

Upper

10

1 4

8

9 5 19 19

11

12

14

6

13

12

18 7

17 15

19 16

12

20

1. covered stage 2. bar 3. seating 4. workshops 5. art space 6. outdoor gallery 7. flexible space 8. skate park 9. black box theatre 10. backstage 11. aerial charlotte 12. theatres 13. clt art league 14. indoor gallery 15. food/kitchen 16. lobby 17. utility 18. storage 19. bathrooms 20. concessions 21. ada elevator

2

3

21

14


Turn static files into dynamic content formats.

Create a flipbook
Allen Tucker's Architecture Portfolio by allentuck - Issuu