Skip to main content

BE - Building Efficiency 2016-2017 by A.G. Coombs

Page 1

2016-2017

Technical Tour-de-force at Darling Harbour Jupiter’s Transformation Monash Children’s Hospital Maintenance in the Heart of Canberra


MANAGING DIRECTOR’S MESSAGE

CHAIRMAN’S MESSAGE

It is an exciting time for the A.G. Coombs Group

system performance, increasing life cycles, and

Welcome to this year’s edition of A.G. Coombs’

with successful progress and completion of

reducing environmental impacts and costs.

publication, Building Efficiency.

Our significant investments in innovation

This is a significant period for the A.G. Coombs

continue to be recognised by industry and

Group with clear realisation of long-term

government and we have provided step change

strategic growth initiatives, and the ongoing

and challenging opportunities for the future.

improvements in project delivery, safety and

strengthening of our technical expertise, multi

systems performance which are clearly resetting

service capability and geographic presence.

This year’s edition of Building Efficiency in a new

industry standards.

significant projects and the delivery of high value technical services to a wide range of leading organisations. Together with fresh innovation, further development of our capabilities, and new

and larger format highlights the growing breadth of advanced building services solutions delivered by the A.G. Coombs Group. It provides a clear testament to our talented people who continue to be our greatest strength, and together with our strong organisational culture and core values are the A.G. Coombs Group’s clear point of difference. The Group continues to grow while being active across a very wide range of facilities, with specialist services and clearly focused capabilities in healthcare (particularly in large acute care hospitals), specialist science facilities, Data Centres and telecommunications facilities, defence establishments, higher education campuses, major airports, as well as large complex commercial, retail and entertainment facilities.

for our clients and people through strong

Advisory services by our large group of industry

performance, bringing safety, innovation

experts is highly valued. Our inputs support

and quality to all we do, underpinned by

improved project delivery, enhanced facility

A.G. Coombs’ long held values of teamwork,

operations and significantly better outcomes from

respect and integrity.

building technologies resulting in better buildings for the businesses and people that depend on them.

There is constant investment in the

Sustainable business operations and providing

wellbeing, and providing an environment that

valued environmental services to our clients to

supports the teamwork required to deliver

improve the sustainability of their businesses

at the highest level. These are all essential

remain a focus. A.G. Coombs’ Environmental

attributes of our integrated business model.

Management System maintains independent certification to the AS/NZS ISO14001

outcomes are central to our delivery of highly collaborative PPP arrangements, complex design and construction projects, sophisticated multi services maintenance, high end technical

Our people are our greatest strength; their safety

based culture.

and a strong teamwork culture are central to our collective success. Being incident and injury free wherever we have a presence, across every part of our operation, is a fundamental commitment.

management and practical advisory services. We remain at the forefront in the implementation

as national certification to Australian Standard

of new technology as it continues to enable

AS4801:2001, and continue to invest in a range

substantial progress in our industry. We lead in

of technology initiatives that contribute to

the application of Building Information Modelling

significant safety improvements.

in building services design while enabling the benefits from off-site and modular fabrication. Making systems installation quicker, more efficient and safer, as well as improving ongoing

certification to SafetyMap Advanced level as well

Looking to the future, the A.G. Coombs Group is well positioned with a strong pipeline of work, respected relationships and leading in-house capabilities, including well-developed and

facilities operation.

robust business infrastructure, to continue to

We are developing and applying new information

valued clients.

deliver outcomes of the highest standard for our

technology to asset management and maintenance to transform the level and usefulness of information available to asset owners and managers and our team. Improving facility and

02

Building Efficiency

It is pleasing that our growth and development has been accompanied by an enduring

We have maintained our longstanding

(BIM), delivering considerable enhancement

development of our people, their safety and

Environmental Management Systems standard.

and wellbeing, continued personal development

Industry leadership, innovation and quality

Our strategy is based on delivering success

The provision of a wide range of specialist technical

Russell Telford Managing Director A.G. Coombs Group

2016-2017

commitment to the A.G. Coombs’ values

The A.G. Coombs Group Board, comprising Executives and Non Executives with a wealth of diverse experience, has a clear-sighted strategic vision for the Group and a strong focus on long-term success and prosperity, supporting growth with strong governance. This A.G. Coombs Group Building Efficiency publication presents just some of our many achievements this year, and I commend this publication to you. Clive Weeks Chairman A.G. Coombs Group


LEFT: Australia’s most exciting and challenging urban renewal project.

COVER: International Convention Centre, Sydney

14 Commissioning – beginning with the end in mind The complex nature of commissioning Monash University’s new Alfred research facility demanded expert input from an experienced commissioning specialist.

12

Melbourne’s New Academic Street

Contents 04

15 RMIT is transforming the centre of its flagship City campus to improve the student experience.

08

16

New Supercomputing Cluster for University of Tasmania

Building the new Monash Children’s Hospital

High performance computing is a powerful

This major project for Monash Health

tool for researchers and requires reliable,

will deliver exceptional care for children

safe, and efficient cooling and power.

and adolescents.

18 Maintaining Barangaroo South, Australia’s premier commercial hub

04

It will house 23,000 office workers and some

Jupiters’ transformation a sure winner

Barangaroo is now open for business.

of Sydney’s best retailers and restaurants –

The $345 million transformation of Jupiters Hotel and Casino on the Gold Coast will

08

create a world-class integrated resort.

06 Specialist service means smooth sailing for SYC

10

A.G. Coombs has been delivering HVAC

Maintaining for success – it’s all in the approach

and mechanical maintenance services

Traditional approaches to asset maintenance

to Sandringham Yacht Club for almost

practices are being revolutionised at the

20 years.

University of Queensland.

07

12

20

Preserving the past, protecting the future

Technical Tour-de-force at Darling Harbour Redevelopment

Maintenance in the heart of Canberra

Museum Victoria’s invaluable collection

The groundbreaking features and technical

Australia, and the National Portrait Gallery,

along with visitors and staff, demand the

challenges of this $3.4 billion dollar project make

all very distinct in design, purpose and

best in fire protection.

it one of Australia’s most exciting developments.

maintenance requirements.

18 Old Parliament House, the High Court of

2016-2017

Building Efficiency

03


Jupiters’ transformation – a sure winner! Jupiters Hotel & Casino is undergoing a $345 million transformation, creating a world-class integrated resort to celebrate the spirit of the Gold Coast that will offer a unique destination for visitors and locals.

H

aving first opened 30 years ago, Jupiters has since

All high usage gaming areas, as well as some premium suites, must

cemented itself as a must-visit destination on the

achieve a very high level of air quality for maximum patron comfort.

Gold Coast with more than 15,000 people visiting the

Also, with the hotel and casino being fully operational throughout the

venue every day.

entire project, the team must be mindful of noise at all times, be it day

In 2006, the complex, which is set amongst seven acres of landscaped gardens and parklands on Broadbeach Island, underwent a $53

or night. The team must also always remain considerate of the property’s six-star status and its VIP guests.

million refurbishment of the casino together with a $16 million

The redevelopment introduces the need for a major infrastructure

refurbishment of its hotel.

upgrade. Working with Probuild and engineering firm AECOM,

Ten years on, work is well underway on a much larger, $345 million

energy plant, which will replace the old plant and service the entire

redevelopment of the property; a project that is creating 1,500

development. There are complexities with the switchover from

construction and operational contracting jobs, and includes the

old plant to new. The existing systems will need to be integrated

creation of a brand new six-star all-suite hotel tower.

with the new plant, requiring system changeovers; a challenge in

A.G. Coombs is responsible for the construction of a new central

Appointed by construction manager Probuild, A.G. Coombs Projects,

a facility that not only operates 24 hours a day, seven days a week, but also has around-the-clock public access. There is no room for

is delivering design and construct HVAC and mechanical services to

error; any downtime must be carefully planned and managed in

the new 17-storey hotel. Scheduled to be completed in time for the

order to minimise risk and maintain operations, with minimal or

Gold Coast 2018 Commonwealth Games, the luxury six-star all-suite

no disruption to the complex’s 1,600 staff and 15,000 daily visitors.

tower is the centrepiece of the Jupiters’ transformation. It will offer

Once operational, the new plant will provide the required increased capacity and significantly improve

only the best in finishes and amenities,

energy efficiency.

VIP gaming facilities, exciting new signature restaurants and bars and six-star suite accommodation. The new HVAC and mechanical services are being designed by A.G. Coombs

...one of the most comprehensive hotel refurbishments ever undertaken in Australia.

“The transformation of Jupiters is a significant milestone in the property’s 30-year history and one which has a strong focus on procuring good quality services,” said Jeff Wellburn,

using Building Information Modelling

Construction Manager at Probuild.

(BIM) methodologies. This intelligent 3D model-based process is enabling the architects, engineers, and construction professionals involved in the project to more efficiently plan, design, construct, and manage the hotel redevelopment. The hotel’s design is being compiled using Autodesk® Revit® software, which has been specifically built to support BIM. The ensuing files

“A.G. Coombs has a solid history and proven experience in delivering large scale, complex projects such as this. With their dedicated Queensland-based team, and a notable commitment to successful project outcomes, we trust in their ability to assist with the redevelopment of this Gold Coast icon.”

will support the generation of the construction documentation, from

Jupiters is the first official partner of the Gold Coast 2018

which all project stakeholders will work, enabling a more accurate,

Commonwealth Games, with the current redevelopment scheduled to

efficient and cost-effective build.

be completed and fully operational in time for this major event.

04

Building Efficiency

2016-2017


01

“A.G. Coombs has a solid history and proven experience in delivering large scale, complex projects such as this. We can trust in their ability to assist with the redevelopment of this Gold Coast icon.” Jeff Wellburn, Construction Manager, Probuild

01 Opened 30 years ago, Jupiters is a must-visit destination with more than 15,000 visitors every day.

02 The $345 million redevelopment is creating 1,500 construction and operational contracting jobs.

03 The luxury tower is the centrepiece of the transformation with VIP gaming, new signature restaurants and bars, and six-star accommodation.

CONCEPT IMAGE FOR ILLUSTRATION PURPOSES ONLY.

02

03

CONCEPT IMAGE FOR ILLUSTRATION PURPOSES ONLY.

2016-2017

Building Efficiency

05


Specialist service means smooth sailing for SYC Situated on the foreshore of Port Phillip Bay, the Sandringham

management and recycling systems. Primary air conditioning for

Yacht Club is Melbourne’s premier sailing club, presenting world-

the Clubhouse is provided by an energy efficient Mitsubishi VRF

class sporting and event facilities right on the water’s edge.

(Variable Refrigerant Flow) system. This system modulates the flow

A

of refrigerant depending upon the heating or cooling requirements of longside the 356-berth floating marina and boat yard,

the building. The technology has been optimised by the A.G. Coombs

the modern Clubhouse encompasses a wide range of

team with the assistance of Mitsubishi experts.

facilities including an a-la-carte restaurant, members’ lounge and bar, café, meeting rooms, an auditorium,

offices, and communications room. It is a sought-after venue for

In February 2016, it was literally all hands on deck when A.G. Coombs participated in the Club’s Mercedes-Benz Brighton Port Phillip

weddings and events.

Challenge. A.G. Coombs staff and guests joined 200 participants and

Sitting on the coast, the Club’s HVAC and mechanical systems

The sailing waters of Port Phillip provided reliable and consistent

and equipment are prone to corrosion and regular maintenance is

winds ensuring that the fleet had an enjoyable sail around the fixed

fundamental to ensuring systems remain functional and last.

marked course in pursuit format. The A.G. Coombs team didn’t place,

A.G. Coombs has been delivering HVAC and mechanical maintenance

but were pleased to be able to support the Club, with the proceeds

crew on a fleet of 22 of Sandringham Yacht Club’s finest keelboats.

services to SYC for almost 20 years.

from the event assisting with the purchase of a new rescue boat for the Club’s junior and youth sailing program.

The A.G. Coombs team maintains everything from the Clubhouse’s HVAC systems, central energy plant, mechanical switchboards, and specialist kitchen exhausts through to the more straightforward split system air conditioners in the nearby Concessions Building, home to several marine-related retailers.

Paul Corfield, Facilities & Operations Manager at Sandringham Yacht Club said, “for almost 20 years, we have relied on A.G. Coombs’ expertise to keep our facilities operating effectively and efficiently. Year upon year, they have proven their capability in delivering bestin-class system and asset management and maintenance services.

SYC has implemented wide-ranging environmental initiatives in recent years, including energy efficient mechanical and air conditioning equipment, low energy lighting, and efficient electrical

Their support also extends to Club events; another example of their ongoing commitment to achieving the best outcomes for us, and for our members.”

switching systems as part of the new Clubhouse project, and significant water management and reuse systems and waste

“Year upon year, A.G. Coombs has proven their capability in delivering best-in-class system and asset management and maintenance services.” Paul Corfield, Facilities & Operations Manager, Sandringham Yacht Club

06

Building Efficiency

2016-2017


“Through its unique whole-of-life approach, the A.G. Coombs Group has previously confirmed their commitment to our objectives, demonstrated via A.G. Coombs Service, A.G. Coombs Advisory and Walker Fire Protection who have all been involved with our buildings, and we trust that the Walker Fire Protection team will deliver a comprehensive fire services outcome that is beneficial to all.” Chris Axton, Senior Facility Manager, Carlton Gardens

Preserving the past, protecting the future

The large scale of a facility significantly influences the way fire safety maintenance plans are structured and implemented. The museum is, in effect, both a single building and a network of individual building spaces. Fire protection services must be managed in accordance with each area’s purpose. Having previously undertaken Integrated Fire Mode Testing at this site, in conjunction with A.G. Coombs Advisory, the Walker Fire Protection team is already knowledgeable in how the fire protection services can be effectively managed with minimal risk. Carefully working around the displays and artefacts is also critical, especially at Museum Victoria’s main storage facility where a significant part of the State Collection is stored, including priceless artefacts and objects that can be thousands of years old, and where, interestingly, Melbourne’s very first tram is stored. Extra care must be taken and procedures precisely followed when inspecting and, in particular, testing the fire systems, to prevent damage from occurring.

Museum Victoria has been creating knowledge, educating

Challenges also revolve around the nature of displays and the

visitors and building the State Collection for more than 150 years.

buildings themselves, such as at Scienceworks, where the Lightning

The collection is an invaluable record of Victoria’s environmental

Room offers 30-minute live shows featuring a Tesla Coil, capable of

and cultural history, and with nearly 17 million objects, documents,

generating more than two million volts of electricity to produce three

photographs and specimens, and along with the museum’s visitors

metre lightning bolts! It is important not to set off fire alarms. There

and staff, demands the best in fire protection.

is also extra difficulty in maintaining systems in heritage buildings

W

alker Fire Protection is delivering the Inspection and Testing of the fire services systems which incorporate the alarm, EWIS, sprinklers, suppression, portables and passive installations across the Museum Victoria

portfolio of facilities. This includes the three major State-owned museums in Melbourne - the Melbourne Museum, the Immigration

such as the Immigration Museum, which is located in the beautifully restored Old Customs House; one of Melbourne’s most important nineteenth century public buildings, and the World Heritage listed Royal Exhibition Building; one of the world’s oldest remaining exhibition pavilions with its meticulously-restored opulent interior, expansive galleries and soaring dome.

Museum, Scienceworks, and associated storage sites. Each location is

Chris Axton, Senior Facility Manager at Carlton Gardens is confident

unique, bringing its own challenges, complexities and criticalities.

in the appointment of Walker Fire Protection to deliver to Museum Victoria’s requirements.

This is being managed and delivered through the creation of sitespecific, task-based maintenance plans, overarching asset management plans and a lifecycle register. The careful management of risk is also

“We have a vision of leading museums that delight, inspire, connect and enrich. At the same time, we must consider safety – of our

critical and, for Museum Victoria, this risk differs from site to site.

staff, our many thousands of visitors, the millions of artefacts in

The Melbourne Museum is the largest museum in the Southern

whole-of-life approach, the A.G. Coombs Group has previously

Hemisphere. It incorporates seven galleries, as well as the Bunjilaka

confirmed their commitment to our objectives, demonstrated

Aboriginal Cultural Centre and the world’s second largest IMAX

via A.G. Coombs Service, A.G. Coombs Advisory and Walker Fire

Theatre screen which features a twin 4K digital laser projection

Protection who have all been involved with our buildings, and we trust

system that utilises a Laser light engine (rather than Xenon lamps) to

that the Walker Fire Protection team will deliver a comprehensive fire

light the large IMAX screen sheet.

services outcome that is beneficial to all.”

our collections, and of our facilities themselves. Through its unique

2016-2017

Building Efficiency

07


New Supercomputing Cluster for University of Tasmania

High Performance Computing (HPC) is a powerful tool for researchers. HPC clusters are, in effect, many computers connected together with a network and centrally coordinated by software. These machines achieve enormous computing power by using hundreds of individual processors (cores) to break up huge computing projects into many smaller pieces and are able to analyse, model or simulate massive datasets. They require reliable, safe, efficient and low maintenance power and cooling systems to support uninterrupted continuous operation.

08

Building Efficiency

2016-2017


The cooling system architecture also provides for future freecooling connections, which will enable UTAS to leverage the benefits of Tasmania’s climate to cool the Data Centre, reducing energy consumption and ongoing operating costs. The power systems are also scalable, using Busway to distribute power to the HPC systems, while a modular UPS system, with generator backup provides protection against the risk of a mains power failure. The construction of new computing facilities in existing, operational buildings is not without challenges. A.G. Coombs’ design incorporated works to strengthen building structure, acoustic works to shield staff and students from plant noise and relocation of existing building services away from the critical space housing the new HPC systems.

T

The construction process is underway during University hours he University of Tasmania (UTAS) which has more than 29,000

and is being managed to minimise disruption to the University’s

students, and campuses in Hobart, Launceston and Burnie, is

normal operations.

currently home to Australia’s fifth largest research data storage infrastructure and Nectar* research node in terms of traffic.

“Our new supercomputer will assist in meeting the growing demand for research processing,” said Nigel Williams, Manager, eResearch

The University’s computing demand is largely driven by its climatic

Infrastructure Services, Information Technology Services at the

and ocean science research, including its Southern Ocean marine

University of Tasmania. “A.G. Coombs’ knowledge and experience in

observation, as well as astronomy and health studies. To keep up with

designing, constructing and supporting Data Centres is apparent and I’m

increasingly data-hungry work, UTAS is installing an additional HPC

looking forward to the new Data Centre being a showcase facility that

cluster to significantly add to its computing capacity.

attracts and enables exciting research projects into our future.”

With the University’s existing Data Centre at capacity, an initial

The UTAS Data Centre project is scheduled for completion by the

expression of interest process to local data centre providers was

end of 2016.

undertaken. This was to determine whether co-locating the HPC infrastructure into an existing data centre facility was both feasible and cost effective, particularly given the density of the infrastructure. A.G. Coombs was able to provide comparative costings for the establishment of a dedicated facility on-campus. Subsequently, a detailed feasibility study was undertaken by A.G. Coombs Advisory to confirm suitability of a new on campus location for the new Research Data Centre. Once a concept design was developed and key site selection criteria satisfied, the University tendered for the construction phase. A.G. Coombs was successful in the tender process and awarded the work. A.G. Coombs Projects’ specialist Data Centre team will deliver the conversion of the Science, Engineering and Technology building basement into a new Research Data Centre. The facility incorporates 100 square metres of white tile space, which will house between 12 and 20 HPC racks. Whilst the rack count is small, the processing power of the new HPC cluster is high, with power

“A.G. Coombs’ knowledge and experience in designing, constructing and supporting Data Centres is apparent and I’m looking forward to the new Data Centre being a showcase facility that enables some exciting research projects in the future.” Nigel Williams, Manager, eResearch Infrastructure Services, Information Technology Services at the University of Tasmania

densities reaching up to 60KW per system. This level of computing requires innovative, scalable and efficient power and cooling systems. A.G. Coombs’ solution included the installation of a chilled water cooling system, that provides flexibility for cooling legacy research HPC systems (through traditional water cooled CRACs) and next generation HPC systems (through direct connect water cooling).

WHAT IS NECTAR? *The National eResearch Collaboration Tools and Resources project (Nectar) provides an online infrastructure that supports researchers to connect with colleagues in Australia and around the world, allowing them to collaborate and share ideas and research outcomes. The Nectar cloud comprises thousands of processors, each of which can run data analysis and simulations in parallel.

2016-2017

Building Efficiency

09


Maintaining for success – it’s all in the approach Traditional task-based maintenance that is delivered piecemeal in separate parts can be costly, in terms of time, resources and money. Often, it pays to realise the benefits of taking a cohesive system-based approach.

A

“

in’t what you do (it’s the way that you do it), that’s

HVAC Maintenance Solution: a complete, strategic whole-of-life

what gets results!”, so sang Ella Fitzgerald in 1939

asset solution.

when she made a very valid point about how approach is key to success.

A.G. Coombs’ approach will see a full performance-based maintenance regime implemented, which applies analytical

Over 75 years later, that sentiment still rings very true. In the world of

processes to assess breakdown, equipment performance

facilities management and asset maintenance, a specialist technician

and corrective maintenance to reduce the ongoing total cost

will attend to chiller plant and HVAC equipment on a scheduled

of maintenance, while optimising system and equipment

basis. Another technician may maintain the Building Management

reliability and performance.

& Controls System (BMCS). A specialist may expertly tune buildings’ systems to use energy efficiency and, another, undertake maintenance on water treatment equipment, and so on. But with so many assets being serviced by so many technicians who are working

Key to developing such an approach is the initial verification and further development of asset lists including improved asset data structures, hierarchies and definitions; an asset condition

for so many different service providers, where does the value lie?

assessment; asset criticality and risk assessments; and the barcoding

The University of Queensland went to market seeking an

Computerised Maintenance Management System and the university’s

experienced service provider to deliver a holistic maintenance

asset management system will also mitigate double-handling of data

solution whereby HVAC assets were no longer maintained as

and provide real-time reporting across all assets.

individual parts, but rather maintained as systems and subsystems. Seeing the assets as a whole, rather than individual parts, relates them to their purpose and reinforces the need to understand their function, operation and replacement requirements. “It is an ideological shift from task-based to performance-based maintenance strategies, which will assist with reducing overall maintenance costs year-by-year without compromising the quality of services,” says Kevin O’Sullivan, Associate Director - Asset Services at The University of Queensland.

of all assets. Direct links between A.G. Coombs sophisticated

The next stage is to plan. Together with the University, A.G. Coombs is developing a 10-year asset lifecycle plan and performancebased preventive maintenance plan, which includes a corrective maintenance reduction plan, as well as management optimisation and efficiency plans for both water and energy. The team also has the advantage of tapping into A.G. Coombs Advisory’s technical expertise with the assessment and management of the BMCS. “The time it takes to undertake the asset verification and develop

This was a major challenge for a University whose scope includes over 380 buildings spanning five major campuses, comprising some 17,900 mechanical services, HVAC and BMCS assets.

the strategic asset plans is well worth it,” noted Kevin O’Sullivan. ”A.G. Coombs’ approach is proving to be very successful. We will have comprehensive asset lists, asset maintenance strategies, and asset lifecycle management plans in place, and we liaise with one

It seemed that the best way to manage complexities around scale was

single dedicated contract manager, making the whole process easy.

through the application of contemporary performance-based asset

We are very pleased with the team’s consistent, reliable, and effective

maintenance methodologies, including reliability-centred, predictive,

approach, and are witnessing the operational outcomes that we

and risk-based maintenance strategies.

originally sought.”

A.G. Coombs was recognised by the University as having the best ability for the challenge, evidenced by the team’s tailored 10

Building Efficiency

2016-2017


“A.G. Coombs’ approach is proving to be very successful. We will have comprehensive asset lists, asset maintenance strategies, and asset lifecycle management plans in place. We liaise with one single dedicated contract manager, making the whole process easy.” Kevin O’Sullivan, Associate Director - Asset Services, The University of Queensland

2016-2017

Building Efficiency

11


Technical Tour-de-force at Darling Harbour Redevelopment Featuring striking contemporary architecture, leading technologies and a unique combination of innovative function spaces and facilities, the new International Convention Centre (ICC) Sydney is positioned as the Asia Pacific’s premier integrated convention, exhibition and entertainment precinct. The scale of this $3.4 billion project and its groundbreaking features and technical challenges make it one of Australia’s most exciting and challenging urban redevelopment projects.

D

eveloped through a Public Private Partnership (PPP) with

condenser water to the chillers as well as the heat exchangers serving

the New South Wales Government and Darling Harbour

refrigeration plant for kitchen and hospitality services.

Live (comprising Lend Lease, HOSTPLUS, Capella Capital, AEG Ogden and Spotless) the new world-class facility is

expected to help bring more than 26 million visitors to Darling Harbour each year.

There are six large hot water generators with a total capacity of 10,650 kW. With associated pumps, these deliver heating water at 80°C to the air handling units, fan coil units and duct mounted heating coils throughout the complex.

It includes convention facilities capable of hosting three separate selfsufficient, concurrent events for up to around 12,000 delegates, as well as an 8,000 seat plenary hall, total exhibition capacity of 35,000 square metres, a premier red carpet theatre with a capacity of 8,000, a grand ballroom to provide premium banqueting space for more than 2,000 people, plus 8,000 square metres of total meeting room space across 70 rooms that link to both the convention and exhibition areas. Appointed by construction manager Lendlease, A.G. Coombs Projects is the sole mechanical and HVAC services provider for the redeveloped Convention building and the new Exhibition and Theatre buildings that make up the complex, with the three being

A number of different types of air distribution and ventilation systems serve the various areas in the ICC to address the particular functional requirements of each area. Over 235 fans are installed. The three theatres in the project have displacement air conditioning systems. These distribute conditioned air into the space from an airtight plenum beneath the tiered seating. A.G. Coombs devised and tested a prototype of this system prior to construction. The systems serving the Ballroom can operate under different scenarios as the space can be subdivided to suit the demands of various events. The systems serving the large Exhibition Halls also operate under a range

delivered simultaneously.

of different scenarios with the space able to be partitioned into halls of

A.G. Coombs is using its leading Building Information Modelling (BIM)

into this very large space at high level using large diameter fabric

capability to complete the design and support the construction of the

ducts and self-adjusting radial diffusers.

various sizes via a series of operable walls. Conditioned air is ducted

mechanical and HVAC systems across the three buildings which are very different and have very specific design requirements.

The air handling units that service the larger and high occupancy

Cooling and heating energy is provided to the complex from a

energy efficiency. EC motors consume on average about 30% less

centrally located energy efficient plant. Chilled water for cooling

electricity than conventional AC motors and offer other advantages.

is generated using six large chillers with a total capacity of 21,400

Their application on this project required considerable investigation

kWr. These are arranged in a series counter flow configuration with

and engineering development to determine optimal installation,

a variable speed primary pumping system to support the wide range

control and commissioning arrangements.

of load conditions. Chilled water is distributed to over 210 separate air

spaces incorporate Electronically Commutated (EC) fans for better

handling units and fan coil units in the ICC buildings.

The multiple large and high ceilinged spaces in the complex required

Heat rejection from all cooling systems is provided for by twelve

at height. A number of innovative safe working-at-height solutions

large cooling towers with a total capacity of 24,600kW delivering

were devised to meet the requirements of the construction manager’s

12

Building Efficiency

2016-2017

significant installation and commissioning work to be carried out


“From the start, we were confident in A.G. Coombs’ ability to not just deliver the HVAC and mechanical services, but to also tackle the big challenges and deliver comprehensive, technical solutions in line with the complex’s operational and energy efficiency requirements.” Richard Eaton, Project Director, Lendlease

A large centrally located energy efficient plantroom provides cooling and heating energy to the complex.

Careful design and installation, detailed system commissioning and stringent safety requirements and to comply with A.G. Coombs AS/

tuning, and energy efficient operation of the complex’s HVAC and

NZS4801 and SafetyMAP Advanced certified safety management system.

mechanical services will play an important role in achieving and maintaining these green building ratings.

Sustainability is a prime focus for the development. The transformation of Darling Harbour has received the highest available rating for master-planned precincts in Australia, demonstrating ‘World Leadership’, by achieving a 6 Star Green Star Communities (v1) rating from the Green Building Council of Australia. It is also the first Australian convention and exhibition facility registered with the US Green Building Council for the internationally recognised

“From the start, we were confident in A.G. Coombs’ ability to not just deliver the HVAC and mechanical services, but to also tackle the big challenges and deliver comprehensive, technical solutions in line with the complex’s operational and energy efficiency requirements.” said Richard Eaton, Project Director at Lendlease. “They have met or exceeded our expectations.”

LEED® green building certification (LEED = Leadership in Energy and

Construction of ICC Sydney is progressing and it is on track to be open

Environmental Design) and is targeting a Gold Certification.

in December 2016. 2016-2017

Building Efficiency

13


Commissioning – beginning with the end in mind Proper commissioning of building systems is a key component of

From previous experience, Icon Co understood the benefits of

project delivery, helping to assure the correct installation and operation

A.G. Coombs’ integrated approach to commissioning. On complex

of the systems that underpin the safe, effective and efficient operation

projects, A.G. Coombs Advisory provides expert resources to closely

of the building and its orderly transition from construction to operation.

M

onash University’s Department of Epidemiology & Preventive Medicine specialises in applied clinical and public health research bringing its core skills of epidemiology, biostatistics and data management to

research programs aimed at reducing suffering, preventing illness and improving quality of life.

manage the commissioning process across multiple trades and systems to assure that integrated system performance can be validated and delivered on time. Involved from the beginning of the PC2 laboratory project’s construction phase, A.G. Coombs Advisory, as appointed Independent Commissioning Agent, undertook a detailed design review for commissionability, addressing not only the building systems but also the construction processes and details required to achieve airtightness.

The Department is located over two buildings within the Alfred Medical Research & Education Precinct in Prahran, Victoria. New Physical Containment (PC2) laboratories are under construction to support the University’s Central Clinical School, and to realise a significant research opportunity.

A comprehensive commissioning plan was formulated with the clear objective of meeting the University’s exacting specification for the facility and the stringent government certification requirements. A large amount of detailed information was compiled and used during construction and commissioning to support the process, and ultimately provide proof of correct systems operation. Cloud computing

Builder Icon Co is undertaking the $7 million fit-out of one of the new PC2 laboratories, with A.G. Coombs Projects delivering the HVAC and mechanical services. The laboratory will provide a flexible, modern teaching space, along with supporting functions including fume cupboards, freezer space, and a new reverse osmosis purified water system. Physical Containment laboratories rely upon sophisticated

functionality was used extensively to facilitate an innovative online commissioning program. Technicians constantly updated secure online project spreadsheets on-site, using hand-held devices. This information was then instantly available to all project team members who had access to the shared system. This initiative helped save valuable time in what was a compressed delivery program.

air flow management systems to maintain pressure hierarchies.

Close liaison throughout the construction process between Advisory

The complex nature of commissioning such a facility demanded the

and the Certifier helped to assure the outcome, as did careful and

expert input from an experienced commissioning specialist.

close witness testing of all systems to ensure commissioning had been undertaken properly and in line with the University and Certifier’s requirements. Emily Mudge, Senior Project Manager at Icon Co said “A.G. Coombs Advisory’s leading commissioning approach is well supported by their experienced Independent Commissioning Agent experts. They have mastered the challenges of working in a live, critical environment, and their initiatives - such as the use of online commissioning tools – enabled close collaboration between all stakeholders, which helped with meeting our tight timeframes. We knew when the University received Advisory’s final commissioning report that the works were not just complete, but also correct.”

“A.G. Coombs Advisory’s leading commissioning approach is well supported by their experienced Independent Commissioning Agent experts … We knew when the University received Advisory’s final commissioning report that the works were not just complete, but also correct.” Emily Mudge, Senior Project Manager, Icon Co 14

Building Efficiency

2016-2017


Melbourne’s New Academic Street

M

elbourne’s RMIT students have said they love being

temporary and interim fire services systems, to keep the buildings

part of the city but it is hard to find space to relax

fully operational and code compliant for the duration of the project.

and enjoy campus life. They want more places to collaborate and study. They also want basic functions,

such as enrolment and program queries to be managed easily and efficiently without waiting in a queue. Taking from these ideas, RMIT is transforming the centre of its flagship City campus to improve the

One of the key challenges is in the preparation of the construction zones. Demolition and alterations are being undertaken to existing floor layouts. The Walker Fire Protection team supports these works by temporarily diverting or supporting the existing fire services

student experience.

around and through these zones, to allow refurbishment works to

The Royal Melbourne Institute of Technology’s New Academic Street

in use during the project. The construction team must always remain

(NAS) project promises to reinvigorate and reinvent the heart of the

mindful of any noise impacts, with specific ‘noisy works’ unable to be

RMIT City campus, creating laneways, gardens, new student spaces

undertaken between 8.30am-6.30pm.

and better library facilities.

continue. Additional attention must also be given to areas that remain

The NAS building is one of the first educational facilities to be

The project comprises a complex building refurbishment of around

delivered under the Green Building Council of Australia’s 5 Star Green

23,000 square metres and a new build of 6,500 square metres

Star Interiors Pilot Tool that certifies the sustainability attributes of

within the confines of Buildings 8, 10, 12 and 14. A carefully planned

interior fitout.

construction program will see significant upgrades to student facilities – the Swanston Library, the Student Hall (supporting enrolment and program queries), collaboration spaces and food options – to improve life on campus. The program is being delivered in three stages with a target completion in mid-2017. Key facilities will be completed progressively allowing students to enjoy the benefits as soon as possible.

“RMIT has a reputation for delivering innovative academic programs within stunning modern and historic buildings located in Melbourne’s CBD,” said Graeme Andrews, Services Manager at Lendlease. “Working with Walker Fire Protection, we know that we will be able to deliver to the University’s requirements, ensuring a reinvigorated Swanston Street campus that is properly fire protected.”

The transformation also calls for substantial works on the facility’s existing fire protection systems and the installation of new fire safety-related equipment. The finished systems will support both refurbished and new areas. Working with construction managers Lendlease, Walker Fire Protection is delivering design coordination, supply, delivery, installation, commissioning and certification of the fire services on this project. This includes the dry systems; smoke and fire detection and the Emergency Warning & Intercommunication System, and wet fire systems; sprinkler and hydrant systems. Also included are

“Working with Walker Fire Protection, we know that we will be able to deliver to the University’s requirements, ensuring a reinvigorated Swanston Street campus that is properly fire protected.” Graeme Andrews, Services Manager, Lendlease 2016-2017

Building Efficiency

15


Building the new Monash Children’s Hospital The new Monash Children’s Hospital is one of the biggest capital infrastructure projects to date for Monash Health. The new facility promises to deliver an indoor environment that enables exceptional care for children and adolescents, while delivering efficient and cost-effective operation.

F

rom its nineteenth century origins in the Queen Victoria Hospital for Women and Children, and at Prince Henry’s Hospital in Melbourne, the health and wellbeing of children has always been a priority for the Monash Children’s Hospital.

Today, a new Monash Children’s Hospital is being built in Clayton, Victoria, to support the needs of the young families who are moving to the rapid growth areas of south eastern and outer metropolitan Melbourne. Due to open in early 2017, this 230-bed hospital, which is co-located next to Monash Medical Centre, will be one of only two tertiary paediatric facilities for Victorian children and their families, and will include a purpose-built facility where clinical services will be delivered in a child and family-friendly environment. It will also be the only location in Victoria that provides foetal surgery, thalassemia and paediatric cardiac electro-physiology. These unique services have brought with them distinctive challenges in the design and installation of the hospital’s systems. It has been far from straightforward for A.G. Coombs, who were appointed by managing contractor Lendlease Building, to deliver the HVAC and mechanical services - including the Building Management and Controls System - and specialist medical systems including medical gasses and the pneumatic tube transport system.

theatres plus a dedicated endoscopy suite, and many more specialist services. Everything from close temperature and humidity control for individuals through to cleanliness and operational requirements needed consideration at the initial design stage, a complex process that involved many stages of planning. Additionally, the building was to be future-proofed with the capacity to expand if required. A.G. Coombs’ input during the Early Contractor Involvement (ECI) stage introduced value-add initiatives such as the reduction of air conditioning zoning

The new hospital will offer 96 in-patient acute beds, 10 pediatric

complexity, rationalisation of chilled and heating water thermal

intensive care beds, 64 newborn cots, 20 early-in-life mental

plant equipment types and sizing, and rationalisation of air

health service beds, eight neuro developmental psychiatry beds,

handling unit zoning and multizone and single zone units.

20 same-day beds, 12 oncology same-day beds, three operating

These initiatives, amongst others, resulted in a saving of

16

Building Efficiency

2016-2017


“We are very pleased with A.G. Coombs’ expertise and professionalism in delivering this new healthcare facility. Their experience on similar projects makes them a reliable and trusted partner in building this world-class facility.” Andrew Miller, Services Manager, Lendlease

approximately $2.5 million and helped with identifying effective

and to significantly reduce the extent of drilling overhead into the

solutions for other design challenges.

slab soffit.

Construction has delivered other initiatives, including the upgrade of

In September 2015, the Premier of Victoria and the Victorian Minister

the existing Monash Medical Centre’s medical gas infrastructure and

for Health and Ambulance Services were present at the new hospital’s

connecting it to the new building. A.G. Coombs’ leading prefabrication

“topping off” celebrations. Since then, the new facility’s systems have

methodologies have also contributed to achieving the short, two-year

been commissioned to help ensure optimal operational performance

construction program for the new facility. Eight vertical services

from day one, when the hospital opens early in 2017.

risers in 16 large modules were installed, lifted into place with the assistance of the site’s two tower cranes, ‘Hefty’ and ‘Monty’, named by some of the hospital’s young patients! The use of prefabrication helped to reduce construction time, as well as reducing risk and

Andrew Miller, Services Manager for Lendlease said “The new Monash Children’s Hospital promises to be an outstanding new hospital for Victoria. We are very happy with the project’s progress to date, and

improving on-site safety.

are very pleased with A.G. Coombs’ expertise and professionalism in

Trimble digital positioning technology was used for setting-out of

projects makes them a reliable and trusted partner in building this

supports for high-level pipework and ductwork to ensure accuracy

world-class facility.”

delivering this new healthcare facility. Their experience on similar

2016-2017

Building Efficiency

17


Maintaining Barangaroo South, Australia’s premier commercial hub Set to house approximately 23,000 office workers and some of Sydney’s best retailers and restaurants, Barangaroo is now open for business.

L

ocated on the world-famous Sydney Harbour, Barangaroo offers scale and quality on par with the world’s best office precincts. The development’s three high-rise, premium grade office buildings known as International Towers

Sydney, collectively offer over 280,000 square metres of office space; the equivalent Net Lettable Area to Governor Philip and Governor Macquarie Towers, Aurora Place, Deutsche Bank Place, Chifley Tower and 8 Chifley Square combined.

So far, the project has consumed over 12 million construction hours with an average of 1,500 workers on site. This includes the A.G. Coombs Projects team, who were the specialist HVAC and mechanical services contractor for Tower Two, which was completed and opened 1 July 2015, and Tower One, which is set to open at end of 2016. As of July 2016, 7,000 office workers had moved into Tower Two, 25 retailers were trading across the precinct, and office workers had started moving into the newly opened Tower 3, approximately 2,000 at a time! When the tenants were in transit, A.G. Coombs began delivering HVAC and mechanical maintenance services to Tower Two and Tower Three as well as to plant and equipment in the shared services basement, which also houses the site’s centralised precinct services.

18

Building Efficiency

2016-2017


Ensuring continuity of building services with minimal disruption to everyday operations has been of critical importance. Preventative maintenance schedules must always consider office tenant and retailer requirements, including security. The team has had to remain flexible. Servicing buildings in a precinct that is under construction is a major challenge. Commissioning and fine tuning of the building’s systems is ongoing, in part to meet changing requirements. Fortunately, the maintenance team can draw on the knowledge of the A.G. Coombs Projects team to keep on top of the changes. Several major tenants in Tower Two have moved across from older properties, and were familiar with more tightly controlled office temperatures compared to the modulating environmental control that is a feature of the new 6 Star Green Star facilities. A.G. Coombs’ National Customer Service Centre was kept busy after move-in, logging calls regarding these temperature ‘issues’. A.G. Coombs worked closely with client and facility manager JLL, as well as Building Management and Controls System provider Honeywell, to rectify issues and to help educate tenants on the new conditions. Being one of the most significant waterfront transformations currently underway anywhere in the world, and Australia’s largest precinct development, Barangaroo is constantly in the watchful eye

“We had to ensure that the best teams were involved in the maintenance of the towers; people who understand the evolving needs of the large corporate occupiers, as well as the Precinct’s environmental requirements. A.G. Coombs ticked all the boxes and, to date, have shown high levels of professionalism, expertise, and understanding in their delivery of maintenance services whilst remaining mindful of ongoing operations and tenant activity.” Tony Byrne, General Manager Towers Two and Three, International Towers Sydney

of the media. When complete, the site is expected to attract some 18 million visits per year, with more than fifty percent of the precinct being open public space, and all of the foreshore to be fully accessible to pedestrians and cyclists. The HVAC and mechanical services play a significant role in the buildings’ operational energy usage and environmental impact. When complete International Towers Sydney is targeting 5 Star NABERS Energy ratings. All this adds pressure to

the maintenance team in ensuring that International Towers Sydney continues to operate effectively, efficiently and safely. “The development of International Towers Sydney is positive for the city’s global profile,” explained Tony Byrne, General Manager, Towers Two and Three, International Towers Sydney. “We had to ensure that the best teams were involved in the maintenance of the towers; people who understand the evolving needs of the large corporate occupiers, as well as the Precinct’s environmental requirements. A.G. Coombs ticked all the boxes and, to date, have shown high levels of professionalism, expertise, and understanding in their delivery of maintenance services whilst remaining mindful of ongoing operations and tenant activity.”

2016-2017

Building Efficiency

19


Maintenance in the heart of Canberra Old Parliament House, the High Court of Australia, and the National Portrait Gallery are three of the most iconic buildings in the heart of Australia’s capital. Rich in history, and significant to Australia’s past, present and future, each is very distinct in design, purpose and ongoing maintenance requirements.

M

anaging the scheduled and corrective building services

assigned to the assets based on the nature of the item, the role it

maintenance requirements of three buildings under an

plays in the building services system, and the criticality of the facility

integrated delivery model enables resources, knowledge

function supported. A sophisticated Computerised Maintenance

and innovation to be shared across the sites. This, in

Management System is used to drive the specially tailored

turn, will lead to improvements in systems reliability and efficiency, and best-in-class outcomes for all.

maintenance programs for each facility. At the National Portrait Gallery, around-the-clock close tolerance

This is precisely how Integrated Technical Management (ITM) is

temperature and humidity control, made possible via carefully

planning and managing its delivery of electrical, mechanical, fire and

designed and maintenance critical HVAC systems, is helping to

building services maintenance to Old Parliament House, the High Court

preserve the valuable artwork on display. Throughout the building,

of Australia and the National Portrait Gallery, yet, at the same time,

key lighting systems play an important role in visitor satisfaction, in

never losing sight of each facility’s distinct characteristics, specific

bringing the portraits of prominent Australians to life.

service parameters and the particular challenges that these bring.

Overlooking Lake Burley Griffin, and a short walk from the Portrait

Old Parliament House is central to Canberra’s Parliamentary Triangle.

Gallery, is the High Court of Australia. The 40-metre tall building is

It opened in 1927 and served as the seat of the Parliament of Australia

essentially one of concrete and glass comprising a number of major

until 1988. In 2009, it became home to the Museum of Australian

functional elements, including a large public hall, three courtrooms,

Democracy (MOAD). The building, with its original fittings and

an administrative wing, and Justices chambers. In supporting its

furnishings, is heritage-listed, and has a set of specific standards

working functions there are significant mechanical, electrical and

and protocols around maintenance and restoration, including its

other technical systems, at various points in their life cycle, requiring

own Heritage Management Plan. As with all three buildings, which

appropriate levels of maintenance.

are open to the public year-round, continuity of building services is essential. The challenge here, however, lies within the large number

Stephen Kaye, Manager Facilities and Procurement at MOAD said,

of stakeholders who must be approached before changes to the

“ITM has a unique whole-of-asset-life approach to building services

building can be made. The ITM team must be careful, not just when

management and maintenance; one that ensures the best outcomes

undertaking maintenance works, but also in the identification and

for everybody. In facilities such as ours, there’s no room for error

planning of new building system concepts or innovations, ensuring

when it comes to building systems operations and functionality; we

that the building’s heritage will not be compromised.

trust in the team’s knowledge, multi-skilled technical expertise and

The scope of works across all three sites includes managing and

ability to deliver.”

maintaining the operation and functionality of all the mechanical,

Lawrence Fraser, Building Manager at the National Portrait

electrical, fire, hydraulic and associated building services, including

Gallery, agrees.

the Building Management and Controls Systems, along with lifts, roller shutter and automatic doors. On-site multi-skilled ITM technicians are supported 24/7 by the A.G. Coombs Group’s National Customer Service Centre and always have access to A.G. Coombs’

“ITM was engaged in 2010 to manage the Gallery’s electrical infrastructure including complex lighting, audio visual and electrical systems. ITM have already been involved in lighting upgrades in the Gallery, reducing

engineering and broader technical capabilities.

approximately 5% of our total electrical energy used and also saving 100s

A whole-of life asset management approach has been adopted to

expanded in 2016, with ITM now engaged to provide whole of building

achieve the best operational and long-term outcomes for all three

maintenance including electrical, fire, hydraulic and mechanical systems.

facilities. This approach considers the entire lifecycle of building

Leveraging on previous success, with experienced staff and the backup

services assets, based on detailed condition audits through to

of the A.G. Coombs group, ITM are perfectly placed to add new levels of

lifecycle replacement strategies. Maintenance criticality ratings are

capability and possibility into the National Portrait Gallery building.”

20

Building Efficiency

2016-2017

of man hours required to maintain the original lights. This work has been


IMAGE: COURTESY OF OLD PARLIAMENT HOUSE. ANDREW MERRY PHOTOGRAPHY

01

02

01

02

Old Parliament House was the seat of the Parliament of Australia until 1988. In 2009, it became home to the Museum of Australian Democracy.

Situated on Lake Burley Griffin the High Court of Australia is the highest court in the Australian judicial system.

“ITM has a unique whole-of-assetlife approach to building services management and maintenance; one that ensures the best outcomes for everybody.” Stephen Kaye, Manager Facilities and Procurement, Museum of Australian Democracy

2016-2017

Building Efficiency

21


News Recognising training achievements A.G. Coombs apprentices and trainees have received recognition for their effort and dedication to training. Fourth Year Refrigeration Apprentice, Michael Lithotomos of A.G. Coombs Service, was presented with the prestigious 2015 Allan Coombs Training Award, named after the Company’s founder, Mr Allan George Coombs AM. He also received the AMCA Victorian Training Achievement Category Award for Refrigeration & Air Conditioning. Jackson Taylor, A.G. Coombs (Projects) Drafting Trainee was awarded the AMCA Victorian Training Achievement Award together with the Category Award for Drafting and, Aimee Stanton, A.G. Coombs (Projects) Mechanical Plumbing Apprentice, was presented with an AMCA Presidents Encouragement Award in the Category for

Brandon Sorl received the Encouragement

Mechanical Plumbing.

Second Year Plumbing Award.

At the Holmesglen Institute Awards Festival, A.G. Coombs (Projects) Mechanical Plumbing Apprentice Kallum Nash was presented with

ABOVE Michael Lithotomos and A.G. Coombs Group Managing Director Russell Telford

A.G. Coombs’ award winning training program has over 50 apprentices and

the Best Third Year Plumbing Apprentice

trainees in the fields of mechanical

(Mechanical) Award and A.G. Coombs

plumbing, drafting, electro technology,

(Projects) Mechanical Plumbing Apprentice

refrigeration and sprinkler fitting.

A.G. Coombs partners with Richmond Football Club A.G. Coombs has entered into a new three-year partnership with Richmond Football Club. Through the partnership, A.G. Coombs is the Club’s official partner for facilities maintenance of building services, including air conditioning, mechanical services and fire protection. The partnership also extends to supporting Richmond’s centre for Indigenous youth, the Korin Gamadji Institute (KGI). A.G. Coombs will be a presenting partner for one of four KGI REAL Programs; a four-day leadership program for Aboriginal and Torres Strait Islander students aged 13 to 16.

22

Building Efficiency

2016-2017


A.G. Coombs is applying new technology to

Using analytics for improving building performance

facilitate the cost effective acquisition of detailed information about plant and equipment assets, and their real-time operation. This powerful asset management system and ‘rules

Advances in digital technology are providing

based’ analytics software enables us to sort,

valuable information to help A.G. Coombs

assess and evaluate this new wealth of data

improve the operation and maintenance of

to provide powerful insights into how to better

installed building systems including HVAC,

manage, operate and maintain building services

electrical and lighting systems, and lifts

systems for improved systems performance, life

and escalators.

cycle cost and energy efficiency outcomes.

the stringent SafetyMAP Advanced Level. In successfully retaining both accreditations for the next three years A.G. Coombs demonstrated that its personnel apply highlevel safety standards across all sites and ensure adherence to safety processes and procedures, and all state laws and industry regulations, to ensure the safe and reliable delivery of services. In this we: • ensure that the management of health

Safety is all about people

and safety is an integral part of all of our operations; • provide the necessary training, equipment and resources so that all work can be

In the A.G. Coombs Group we understand that safety is all about people. Our vision is to achieve injury-free workplaces. Since 2000 we have maintained a best

completed efficiently and safely; • establish, and regularly reviewing, safety objectives and targets; • apply the key principles of hazard

practice, fully integrated safety management

identification, risk assessment and

system that is independently certified to

control to all tasks; and

Australian Standard AS/NZS 4801:2001 and

•

AIRAH Innovation Award to A.G. Coombs and Lendlease

undertake workplace consultation.

A.G. Coombs and Lendlease have been presented with the Excellence in Innovation Award at the AIRAH Awards for the prefabricated services risers at Barangaroo. Each year, the Australian Institute of Refrigeration, Air Conditioning and Heating (AIRAH) Awards recognise excellence in the HVAC&R industry. The Excellence in Innovation Award recognises significant Australian improvements in the areas of HVAC&R achieved through innovation.

A new look A.G. Coombs Group! Fresh branding has been rolled out across the A.G. Coombs Group. When revealing the new logos early in

position as a progressive group of companies in the marketplace”. The new branding coincides with the golive of the new A.G. Coombs Group website. The new site strongly reflects A.G. Coombs’ capabilities and market position as the

The single biggest safety risk identified by Lendlease at Barangaroo was the installation of services risers in the high-rise towers. A.G. Coombs introduced its innovative prefabricated riser methodology, something that had not been applied before to very tall buildings in Australia. Over 4,000 hours of complicated site installation per tower

2016 Managing Director, Russell Telford

leading provider of specialist building

were transferred into a controlled factory

said, “They are an evolution of our previous

services through the extensive use of case

environment and the need to work at

branding and accurately reflect A.G. Coombs’

studies and images of our work.

height almost eliminated. 2016-2017

Building Efficiency

23


A.G. Coombs Group The A.G. Coombs Group is a privately owned Australian group of companies that provides an integrated range of technical services for all systems in buildings, from design through to installation, commissioning, maintenance and ongoing operation and management. Operating for over 70 years, A.G. Coombs has a national capability with major operations on Australia’s eastern seaboard. Melbourne 03 9248 2700 | Sydney 02 8020 6000 | Canberra 02 6217 5600 Brisbane 07 3648 0500 | agcoombs.com.au

A.G. Coombs Projects A.G. Coombs Projects leverage a National Centre of Excellence approach, where teamwork and project management skills set the company apart. This approach also provides high end engineering, project management and site personnel to deliver successful projects throughout Australia. 03 9248 2700 | agcoombs.com.au/projects/

A.G. Coombs Service A.G. Coombs Service is a specialist provider of air conditioning, mechanical services, building controls and bundled services maintenance. Delivering 24/7 building support, the company is a preferred supplier to the Facilities Management Industry and provides professionally managed, highly qualified technical staff to achieve improved reliability, lower costs and regulatory compliance in commercial, retail and industrial buildings. 03 9676 4600 | agcoombs.com.au/service/

A.G. Coombs Advisory A.G. Coombs Advisory provides quality advice and consulting services across numerous disciplines including mechanical, electrical, hydraulics and fire protection services and building technologies. A.G. Coombs Advisory is Australia’s leading provider of Green Star Independent Commissioning Agent (ICA) services for projects requiring Green Star ‘As Built’ Certification. 03 9248 2700 | agcoombs.com.au/advisory/

Walker Fire Protection Walker Fire Protection provides a range of fire protection and detection services, from high end project engineering advice and consultancy through to concept and detailed design, installation of all types of fire detection and suppression systems, and ongoing inspection, testing, maintenance and regulatory compliance support. 03 9279 7100 | agcoombs.com.au/walkerfire/

Integrated Technical Management Integrated Technical Management is a high quality provider of Technical Facilities Management specialising in technically complex and critical facilities such as data and internet centres, major commercial complexes and sophisticated industrial plants. 03 9248 2700 | agcoombs.com.au/itm/

26 Cochranes Road (PO Box 1136) Moorabbin, VIC 3189 General Enquiry: 03 9248 2700

www.agcoombs.com.au

IMAGE COURTESY OF HASSELL