2023 NS URRI - december 2021 edition

Page 36

URRI NS 2023 – December 2021 edition 2.3.3.3 RU’s obligations When using the railway infrastructure, the RU shall: 

abide by and comply with the provisions and requirements laid down by the ANSFISA, TRA and IM;

utilise only type-approved and registered towing and towed rolling stock for its operations;

utilise the said rolling stock consistently with the instructions provided by the manufacturer and with any restrictions/requirements laid down during the technical qualification process, with the utilise profile thereof and in accordance with the provisions and procedures issued by the RU itself and notified to the National Rail And Road And Motorway Infrastructure Safety Agency (ANSFISA), in connection with the registration process;

perform its operations on the Umbrian Regional Railway Infrastructure in accordance with the applicable regulatory framework and the Single Safety Certificate granted by the ANSFISA, i.e. the National Rail And Road And Motorway Infrastructure Safety Agency, or by the European Railway Agency (ERA);

assure that the personnel responsible for driving, accompanying, supervising and composing the trains, possesses the physical and professional requirements envisaged under the applicable regulations and aimed at ensuring the knowledge of and full compliance with the operating and safety regulations applied by the IM, both in ordinary and exceptional operating conditions;

assume full and exclusive responsibility for the rolling stock used, vis-à-vis the customers and the Authorities, conditional on the IM’s having approved its operating services on the railway infrastructure;

implement a Safety Management System, in accordance with the applicable regulations;

not alter the characteristics of the licence and the safety certificate, on the basis of which it has been qualified to perform the operations under the Access Contract, during the term thereof;

promptly notify the IM and suspend its services, even of its own accord if the circumstances so require, in the event of any measures requiring the suspension, withdrawal or amendment of the licence or entitlement document;

promptly notify the IM of any events or circumstances occurring when the safety certificate was issued, taking the necessary steps to suspend its services, even of its own accord if the circumstances so require;

abide by and comply with the instructions imparted by the IM at the time of the train departure and during the journey;

provide the useful information for the proper and punctual request of the agreement during the delivery of its services;

utilise the path(s) as stipulated in the daily schedule of services, in accordance with the path planning specifications, such as: -

36

type of locomotive; type of hauled rolling stock, indicating the speed, vehicle rank and braking system; hauled mass; axle mass; braked mass percentage; length of train; full functionality of the redundant systems on board the trains.

allow, at no expense for the IM, access to the driver’s cabin of its rolling stock by the IM’s personnel responsible for carrying out scheduled/special inspections of the infrastructure’s maintenance conditions, in accordance with the ad hoc Procedure issued by the IM pursuant to article 3 of Decree 5/2010 of the ANSF;


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

2.4.5 INQUIRIES CONCERNING OPERATING ACCIDENTS / DISRUPTIONS

3min
page 48

utilisation of back-up locomotives/vehicles

9min
pages 45-47

2.4.3 DISRUPTED TRAFFIC MANAGEMENT

2min
page 43

2.3.2.1.1 Any further formalities for contract conclusion purposes (updated in December 2021

3min
page 30

2.3.2.3 Insurance covers (updated in December 2021

2min
page 32

2.3.3.2 IM’s Obligations

3min
page 35

declaration for sections with at least three consecutive saturated time slots and how to calculate penalties. (December 2020) Par. 4.3.1. Update of the terms of the allocation process (December 2021) Par. 4.3.2. Inclusion of the specification of the possibility for the IM to re-plan an assigned railway path if re-planning becomes necessary in order to reconcile as effectively as possible all path requests and if it is approved by the applicant to which the path had been assigned (requirement 4.3.1, TRA Resolution 158/2021) Par. 4.3.3. Change of time table for interim adjustment (December 2020) Par. 4.3.3. Change of time table for interim adjustment (December 2021) Par. 4.3.4. New delivery times for commercial scheduling measures (December 2021) Par. 4.4.1.1 elimination, pursuant to requirement 4.3.2. of TRA Resolution 158/2021 Par. 4.4.1.2 Adaptation of the coordination procedure to the provisions of art. 10, par. 5, of Regulation 2016/545/EU (December 2020) Par. 5.2. Adaptation of the description of the Public Information (IaP) included in the MAP to the new RFI CoP 365/RFI procedure of 01/04/2021 (December 2021) Par. 5.5.2 proposal for streamlining the process of requesting and providing customised public information (December 2020) Introduction of the description of the complementary HUB information system (December 2020) Adaptation of the description of the complementary information to the new RFI CoP 365/RFI procedure of 01/04/2021 (December 2021) Par. 6.2. reference to the methodological document sent by the IM to the TRA with a note dated 17 November 2020 (Article prot. 18147/2020). (December 2020) Par. 6.3.1. new MAP tariffs after sending the tariff proposal to TRA Par. 6.3.3.2 reference to a possible introduction of an extra MAP tariff for the PRM assistance service (December 2020) Par. 6.3.4.1. New specifications regarding customised public information. (December 2020) Introduction of the complementary HUB information system (December 2020) Par. 6.4 Alignment of the Performance Regime regulation with the provisions of the annexes to TRA Resolutions no. 70/2014 point 7.6.1 no. 76/2014 point 6.2 (December 2020) Appendices to Chapter 6 - Part B introduced a time line for the presentation of any corrections by the RUs to the paths/services reported in order to further regulate the process (updated December 2021) Appendices to Chapter 6 - Part C Alignment of the Performance Regime regulation with the provisions of the relevant regulatory changes

4min
page 4

2.4.2 MANAGEMENT RULES

1min
page 42

1.7 PUBLISHING

1min
page 22

GLOSSARY (UPDATED IN DECEMBER 2021

14min
pages 10-16

2.3.3.3 RU’s obligations

2min
page 36
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.