Figure 5.46. VPD South Linear Lot

Figure 5.47. Beach Linear Parking

Figure 5.48. Drainage issues at South Lot

The parking lot near the south entrance to the zoo is in poor condition (Figure 5.48 & 5.49). The pavement has many patches and is oversized for a typical parking lot design (Figure 5.50). The parking lot received a very low PASER of 2. The lot near Orchard Street is also in poor condition with cracking and has a PASER of 4 (Figure 5.51). Both parking lots have failing curbing along most edges. Both lots also have connections to walks.

Figure 5.49. VPD South Parking Lot

Figure 5.50. South Parking Lot

Figure 5.51. Parking Lot at Orchard

BRIDGES A structural load rating analysis for the historic bridge at the west end of Vilas Park Drive was performed by Strand Associates in 2012. The bridge was constructed in 1915 and has a wood pile foundation (Figure 5.52). The Strand analysis estimated a load capacity of approximately 11.1 tons (capable of safely supporting a bus) for the bridge. The stone façade of the bridge is in good condition, but the masonry joints need tuck pointing (Figure 5.53). The concrete arch support has several cracks and gaps also in need of masonry work (Figure 5.54).

Figure 5.52. Historic Bridge

88

Figure 5.53. Stonework of Bridge

VILAS PARK MASTER PLAN 2020

Figure 5.54. Bridge Structure


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Vilas Park Master Plan Report by MSA Professional Services - Issuu