Investigation and Analysis of Factor Affecting Cost Overrun For Bridge Construction

Page 5

International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538 Volume 10 Issue VII July 2022- Available at www.ijraset.com Political communication among different agencies can affect in cost. Is it important factor?

1.9556

1.06506

45

Fraudulent practices and kickbacks can affect in cost. Are you agree in this factor?

1.9111

.90006

45

local traffic issues affect to the cost overrun while constructing flyover Bridge . Are you agree?

1.9778

.96505

45

land acquisition for construction affects in cost overrun. Are you agree with this factor?

1.7778

.76541

45

2.2889

1.01404

45

1.8222

.96032

45

Idle labour, machinery and daily supply of the material affect Cost overrun. Are you agree with this factor? Strike, regulation, accident, global pandemic affects in cost overrun. Are you agree with this factor?

V. CONCLUSION A structured questionnaire survey approach was used to study the impact of various attributes and factors affecting construction projects performance for the factors analysis in flyover bridge construction industry. thirty (30) factors were considered in this study and were listed under groups based on relevant literature review and data collected. 58 questionnaires were distributed as follows: (58 Forms were distributed among different engineer who were releated to flyover bridge construction were received as respondents. Among them 44 forms were respondent. The results were analyzed, discussed to identify the most important factors, in which Likert 5-point Scale was used for preparing the feedback form spss tool was used for the analysis to determine clients, consultants and contractors perception of construction projects of flyover bridge According to the questionnaire was prepared send to clients, consultants and contractors, engineers and data was collected to analysis the factors for flyover bridge construction VI. ACKNOWLEDGEMENT Foremost, I would like to express my sincere gratitude to my advisor Assistant Professor Nimita Gujar for enlightening me at the first glance of research, and for his patience, motivation, enthusiasm, and immense knowledge. His guidance helped me in all the time of research and writing of this thesis. I could not have imagined having a better advisor and mentor for my project work. I am extremely thankful to Dr. Bhavesh Mewada, Principal, PIET for providing me infrastructural facilities to work in, without which this work would not have been possible. I would also like to thank our concrete lab assistant Harshad Kapadi and Anup Kude for their support whenever I needed. At the last but not least I would like to thanks my all the teacherand friends to helping me. REFERENCES [1]

WN Kawmudi and SD Jayasooriya (2021) IDENTIFICATION OF SIGNIFICANT FACTORS INFLUENCING COST OVERRUNS IN CONSTRUCTION PROJECTS OF SRI LANKA [2] Chhavi Gupta and Chitranjan Kumar (2020) Study of Factors Causing Cost and Time Overrun in Construction Projects [3] A.Cindrela Devi1,and K.Ananthanarayanan (2017) Factors influencing cost over-run in Indian construction projects [4] Agarwal, M. (2013). International Journal of Advanced Research in Computer Science and Software Engineering, 3(10), 572–576. [5] Jalaei, F., & Jrade, A. (2014). Construction Research Congress 2014 ©ASCE 2014 140. Construction Research Congress 2014, (2008), 140–149. https://doi.org/10.1061/9780784413517.176 [6] Knight, K., & Robinson Fayek, A. (2002). Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects. Journal of Construction Engineering and Management, 128(6),503–51https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(503) [7] Ling, F. Y. Y., Ke, Y., Kumaraswamy, M. M., Asce, M., & Wang, S. (2013). Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 142(March), 1–12. https://doi.org/10.1061/(ASCE)CO.1943-7862 [8] Literature, B. (1999). EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES, 2(September), 15–17 [9] Megha, D., & Rajiv, B. (2250). A Methodology for Ranking of Causes of Delayfor Residential Construction Projects in Indian Context. International [10] Journal ofEmerging Technology and Advanced Engineering Website: Www.ijetae.com ISO Certified Journal, 9001(3), 396–404. [11] Ramabodu, M. S., & Verster, J. J. P. (2010). Factors Contributing to Cost Overruns of Construction Projects. Proceeding of ASOCSA 5th Built Environment Conference, Durban South Africa, 131–143. Retrieved from https://www.irbnet.de/daten/iconda/CIB_DC22746.pdf [12] Rathi, A. S., & Khandve, P. V. (2016). Study of Factors Influencing Cost Overruns : An Overview. International Journal of Science and Research (IJSR),5(3),

©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 |

3367


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Investigation and Analysis of Factor Affecting Cost Overrun For Bridge Construction by IJRASET - Issuu