Solution and Answer Guide
• Successful: completed on time, within acceptable quality, satisfies the customer, no continuing liability.
• Organization of the project delivery system: planned project success; able to control the unique project in a systematic, but flexible way.
Architect: Provides design and construction documents; acts as owner’s agent during construction; provides interpretation of the documents.
The subcontractor must go through contract lines and express concerns to the superintendent or project manager, who will then correspond with the architect, who will correspond with the owner.
6. Flame cutting and welding are major causes of site fires. Describe the ways of lowering the risk of fire from these activities.
7. Which of the following is/are considered to be substance abuse, and which is/are considered to be a sickness requiring outside treatment?
• Inform all employees about the hazard communication program, then identify and train employees who may be exposed to hazardous chemicals.