Industrial and Trade Activity Environmental Management Plan
7.
Discharge Monitoring and Reporting 7.1 Monitoring
Discharges from the site will be monitored as required by resource consent condition 173 listed in Table 1-1. The water quality discharge monitoring programme is set out in Section 8 of the FTMP (Appendix H of the CEMP) for discharges from the site which outlines the sampling locations, monitoring parameters, monitoring methods, trigger levels and monitoring reports.
7.2 Reporting Reporting of the monitoring results shall be undertaken in accordance with resource consent conditions 176 and 177, as outlined in Table 1-1. Section 9.5 of the FTMP (Appendix H of the CEMP) details the different water quality reports that will be supplied to Auckland Council (Team Leader Central Monitoring) throughout the main works. These include an initial monitoring report within eight weeks following the start of the monitoring, any non-conforming result report, and the annual monitoring report.
Page 39
| Mt Eden Main Works