JOHN ADAMS ELEMENTARY AND EARLY CHILDHOOD CENTER
BUREAU VERITAS PROJECT: 148303.21R000-001.354
Systems Summary Site Pavement
Asphalt lots with limited areas of concrete aprons and pavement and adjacent concrete sidewalks, curbs, ramps, and stairs
Poor
Site Development
Building-mounted signage; chain link, wrought iron fencing; chain-link fence dumpster enclosures Playgrounds and sports fields Limited park benches, picnic tables, trash receptacles
Fair
Landscaping and Topography
Limited landscaping features including lawns, trees, bushes, and planters Irrigation not present Low site slopes throughout
Fair
Utilities
Municipal water and sewer Local utility-provided electric and natural gas
Good
Site Lighting
Pole-mounted: LED Building-mounted: metal halide
Good
Ancillary Structures
None
Key Issues and Findings
There are a few sections of the asphalt that will require repairs. It is recommended that a lift be installed at the stage for access purposes.
--
Systems Expenditure Forecast
8 www.us.bureauveritas.com | p 800.733.0660