BUREAU VERITAS PROJECT: 148303.21R000-004.354
PATRICK HENRY K-8
2. Building and Site Information
Systems Summary Condition
System
Description
Structure
Masonry bearing walls with metal roof deck supported by open-web steel joists and concrete strip footing foundation system
Good
Façade
Primary Wall Finish: Brick Secondary Wall Finish: EIFS and metal Windows: Aluminum
Good
Roof
Primary: Flat construction with single-ply TPO/PVC membrane
Good
Interiors
Walls: Painted gypsum board and CMU, ceramic tile, unfinished Floors: Carpet, VCT, ceramic tile, epoxy, and unfinished concrete Ceilings: Painted gypsum board and ACT, unfinished/exposed
Good
Elevators
Passenger: 1 hydraulic car serving all floors
Good
Plumbing
Distribution: Copper supply and cast-iron waste and venting Hot Water: Domestic boilers and storage tanks Fixtures: Toilets, urinals, and sinks in all restrooms
Good
HVAC
Central System: Boilers, chillers, air handlers, and cooling tower feeding VAV’s and fan coil units Supplemental components: Ductless split-systems and Make-up air units
Good
Fire Suppression
Wet-pipe sprinkler system, kitchen suppression and fire extinguishers
Good
Electrical
Source and Distribution: Main switchboard, and distribution panels with copper wiring Interior Lighting: LED Emergency Power: ATS
Good
Fire Alarm
Alarm panel with smoke detectors, heat detectors, alarms, strobes, pull stations, and exit signs
Good
Equipment/Special
Commercial kitchen equipment
Good 6 www.us.bureauveritas.com | p 800.733.0660