Facility Condition Assessments - December 16, 2021

Page 8

BUREAU VERITAS PROJECT: 148303.21R000-004.354

PATRICK HENRY K-8

2. Building and Site Information

Systems Summary Condition

System

Description

Structure

Masonry bearing walls with metal roof deck supported by open-web steel joists and concrete strip footing foundation system

Good

Façade

Primary Wall Finish: Brick Secondary Wall Finish: EIFS and metal Windows: Aluminum

Good

Roof

Primary: Flat construction with single-ply TPO/PVC membrane

Good

Interiors

Walls: Painted gypsum board and CMU, ceramic tile, unfinished Floors: Carpet, VCT, ceramic tile, epoxy, and unfinished concrete Ceilings: Painted gypsum board and ACT, unfinished/exposed

Good

Elevators

Passenger: 1 hydraulic car serving all floors

Good

Plumbing

Distribution: Copper supply and cast-iron waste and venting Hot Water: Domestic boilers and storage tanks Fixtures: Toilets, urinals, and sinks in all restrooms

Good

HVAC

Central System: Boilers, chillers, air handlers, and cooling tower feeding VAV’s and fan coil units Supplemental components: Ductless split-systems and Make-up air units

Good

Fire Suppression

Wet-pipe sprinkler system, kitchen suppression and fire extinguishers

Good

Electrical

Source and Distribution: Main switchboard, and distribution panels with copper wiring Interior Lighting: LED Emergency Power: ATS

Good

Fire Alarm

Alarm panel with smoke detectors, heat detectors, alarms, strobes, pull stations, and exit signs

Good

Equipment/Special

Commercial kitchen equipment

Good 6 www.us.bureauveritas.com | p 800.733.0660


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Facility Condition Assessments - December 16, 2021 by ACPSk12 - Issuu